Laserfiche WebLink
` MOUNTArN HOUSE PROPOSED ALTAMONT HEIGHTS TENTATNE MAP 2.0 PROJECT DESCRIPTION <br /> involvement/participation; (3) illicit discharge detection and elimination; (4)construction site <br /> storm water runoff control; (5)post-construction storm water management; and(6)pollution <br /> prevention/good housekeeping for municipal operations. The applicant or builder will submit <br /> the SWMP to the County when submitting project improvement plans. The County and the <br /> MHCSD will review these plans prior to Final Map approval. <br /> ` Water Supply <br /> Water supply will be provided by the MHCSD from the water treatment plant located on the <br /> north side of Byron Road. Pipelines will be extended along Central Parkway from <br /> Neighborhoods C and D. A 3.7 million gallon treated water storage tank will be <br /> .. constructed at the northeast comer of the community college campus south of the <br /> Altamont Heights project site (Machado Checklist, 2006). A booster pump station will be <br /> constructed to provide sufficient flow and pressure to meet peak hour and fire fighting <br /> •. demands (West Yost,2004). <br /> Wastewater <br /> MHCSD will provide wastewater service. The MHCSD operates a wastewater treatment <br /> plant located north of Byron Road. Wastewater from the project site will be conveyed <br /> through an on-site sanitary sewer collection system. This system will include an 8-inch main <br /> line, service laterals,maintenance holes,and cleanouts,which will serve the entire <br /> development. The sewer lines will be installed along the streets prior to paving(Pegasus <br /> Development,2006). <br /> Telephone <br /> Telephone and cable service would be provided by the MHCSD,which may subcontract with <br /> another entity to provide such service to residences in the project area. <br /> Electrical/Gas Lines <br /> The Modesto Irrigation District(MID)will provide electricity and Pacific Gas and Electric <br /> will provide gas service. Construction of the necessary infrastructure to provide these <br /> services will be the responsibility of the two companies. <br /> BlotiCs <br /> As stated in the San Joaquin Multi-Species Habitat Conservation and Open Space Plan <br /> ` (SJMSCP),the applicant will be required to conduct pre-construction surveys and implement <br /> "take" avoidance and minimization measures for special-status species identified in the plan. <br /> In addition,the applicant is required to institute measures to prevent ground squirrel <br /> ` occupation at the project site, consistent with guidelines set forth in the SJMSCP (San <br /> Joaquin COG,2001). <br /> ` A drainage Swale (or wetland feature) runs southwest to northeast across the site. EIP <br /> Associates prepared a wetland delineation report for the proposed project site (EIP <br /> Associates, 2006a). The United States Army Corps of Engineers reviewed the report and <br /> 2-7 <br />