Laserfiche WebLink
6. MOUNTAIN HOUSE PROPOSED ALTAMONT HEIGHTS TENTATIVE MAP 4. ENVIRONMENTAL CHECKLIST <br /> 4.9 LAND USE AND PLANNING <br /> Less Than <br /> ` Potential SPIIIEIR Significant <br /> Significant Requires Impact Due New New <br /> Impact Additional to Mitigation Additional Additional <br /> Less Than Adequately Review:No Measures in Impact Not Mitigation <br /> Significant Addressed in Significant Project Addressed in Measures <br /> V Issue or No Impact SPIIIEIR Impact Description SPIHEIR Required <br /> 9. LAND USE AND PLANNING. <br /> Would the project: <br /> L a) Physically divide an established ■ <br /> community? <br /> b) Conflict with any applicable land ■ <br /> Luse plan,policy,or regulation of an <br /> agency with jurisdiction over the <br /> project(including,but not limited to <br /> the general plan,specific plan,local <br /> ` coastal program,or zoning <br /> ordinance)adopted for the purpose <br /> of avoiding or mitigating an <br /> environmental effect? <br /> c) Conflict with any applicable habitat ■ ❑ ❑ ❑ ❑ ❑ <br /> conservation plan or natural <br /> community conservation plan? <br /> SETTING <br /> The site of the proposed Altamont Heights project is near the western boundary of the <br /> ` Mountain House Community and south of the existing Grant Line Village residences. The <br /> site has been used for dry farming in the past. The project site is currently surrounded by <br /> mostly vacant land either under agriculture production or laying fallow. Figure 4.9-1 shows <br /> land uses directly north/northwest of the project site. <br /> L <br /> i.. <br /> Figure 4.9-1. Views of Grant Line Village homesites. <br /> ` Since implementation of the Mountain House Master Plan(MHMP) in 1994, development <br /> has been occurring in the central portion of the Mountain House Community. Neighborhood <br /> F has been built out and Neighborhoods E and G are partially occupied while construction of <br /> ` these neighborhoods continues as evident in the aerial photo in Figure 2-1. Plans have been <br /> approved for the Mountain House Business Park located in the southeast corner of the <br /> Mountain House Community. <br /> 4-48 <br />