My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006255
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
20058
>
2600 - Land Use Program
>
PA-0600365
>
SU0006255
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2019 1:28:24 PM
Creation date
9/5/2019 10:46:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006255
PE
2638
FACILITY_NAME
PA-0600365
STREET_NUMBER
20058
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
MOUNTAIN HOUSE
APN
20907026
ENTERED_DATE
9/15/2006 12:00:00 AM
SITE_LOCATION
20058 W GRANT LINE RD
RECEIVED_DATE
9/12/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\20058\PA-0600365\SU0006255\CDD OK.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1071
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f , <br /> MOUNTAIN HOUSE PROPOSED ALTAMONT HEIGHTS TENTATIVE MAP 4. ENVIRONMENTAL CHECKLIST <br /> 4.15 TRANSPORTATIONn RAEFIC <br /> The SPIIIEIR'analyzed segments of arterial.roadways and freeways as.Well.as key, <br /> "intersections following buildout of the Mountain House Community rn 2025.-_`T6- 2025 peak <br /> hour LOS on arterial streets before and after`implementation of traffic mitigation measures <br /> recommended in the MEf R and approval's associated with Neighborhoods E+; F.and G were <br /> presented in the SPIIIEIR(EDAW, 2005b,Table 4.11-15). The analysis'reveals that`most of <br /> the segments would operate at.an acceptable LOS even without mitigation. Traffic impacts <br /> on these segrnetits would therefore be`less than significant., -Roadway.widening'is needed to <br /> maintain acceptable LOS in some segments. With implementation of the mitigation <br /> measures;only the segment of Altamont Pass west of Grant Line Road icmains at LOS F. <br /> Following mitigation, the followingsegments would have LOS D' ' <br /> • Byron Road east on Grant.Line Road during the afternoon peak-hour. <br /> • Grant Line Road east of Mountain House Parkway during the afternoon peak-hour. <br /> • Grant Line Road east of Byron Road during the morning and afternoon peak-hours. <br /> The current traffic computer model projects a peak-hour traffic demand of approximately . <br /> 21,000 vph along Tracy/Mountain House corridor of I-205 in 2025. The freeway would not <br /> be able to accommodate all the projected demand in one-hour,and the projected traffic could <br /> only be realized through peak spreading(i.e., spreading the traffic out over-more than one <br /> hour). Most segments of I-580, 1-205, and I-5 north of 1-205 are expected to be over their <br /> capacity, operating at LOS F(EDAW, 2005b). This is a significant and unavoidable <br /> impact, with or without the proposed project. <br /> As commute traffic on highway facilities reaches congested levels, commuters begin to <br /> change their travel patterns by either finding less congested routes or commuting during off- + <br /> peak hours. Already, some traffic leaves the freeways and travels along parallel roadways <br /> such as Von Sosten Road, Grant Line Road, and Byron Road in the Specific Plan III area and <br /> Altamont Pass Road further west of the Specific Plan III area(EDAW, 2005b). i <br /> The 2025 morning and afternoon peak-hour LOS for 50 intersections(assuming the proposed <br /> I-205/Lammers Road interchange is not constructed)are presented in of the SPIIIEIR <br /> (EDAW, 2005b, Table 4.11-16). The data in the table is based on the assumption that the <br /> improvements in the MEfR and the approvals for Neighborhoods E, F and G, as well as the <br /> Grant Line Road improvements proposed in Specific Plan III,have been implemented. No <br /> intersections would have a LOS F. The following intersections would operate at LOS D: <br /> • Grant Line Road/Altamont Pass Road during morning and afternoon peak-hours_ <br /> • Mountain House Parkway/Byron Road in the afternoon. <br /> • Byron Road/Henderson Road in the morning. <br /> • Great Valley Parkway/Byron Road in the afternoon. <br /> All these intersections would require traffic signal control(EDAW, 2005b). <br /> All the Mountain House streets would be built to accommodate projected traffic generated by <br /> build-out of the Mountain House Community and other planned developments in the area. <br /> 4-76 <br />
The URL can be used to link to this page
Your browser does not support the video tag.