t <br /> MOUNTAIN HOUSE PROPOSED ALTAMON'r HEIGHTS TENTATIVE MAP 4.ENVIRONMENTAL CHECKLIST <br /> 4.16 UTILITIES ANMD SERV ICE <br /> could include a cease-and-desist order. If corrective actions do not satisfy the RWQCB, it <br /> could'impose a moratorium on new,sewer connections. Thus, the MHCSD will make sure <br /> wastewater treatment requirements are not exceeded, and a less-thatii-signiCcant impact <br /> s would occur. <br /> Mitigation Measures <br /> 3 No mitigation measures are required. <br /> a, b) Require or result in the construction of-new water or wastewater treatmentfacilities or <br />} expansion of existing facilities, the construction of which could cause significant <br /> 4 environmental effects? <br /> 1 <br /> The proposed project would include 53 low density(R/L) dwelling units and six second <br /> dwelling units (Siegfried Engineering, 2006). The water demand and wastewater generation <br /> for the proposed project at build-out is presented in Table 4.16=1. The water demand and <br /> wastewater generation are 15.2 and 20.0 percent,respectively, of the totals for Specific Plan <br /> IIT. <br /> Table 416-1 <br /> Proposed Altamont Heights Water Demand and Wastewater Generation <br /> Water Unit Wastewater <br /> Unit Water Demand Wastewater Generation <br /> Land Use Units Demand' (gpd) Generationb (gpd) <br /> Low Density 53 du 436 gpd/du 23,100 268 gpd/du 14,200 <br /> Residential ' <br /> Second Units 6 du 156 gpd/du 900 172 gpd/dd 1,000 <br /> Totals 59 du - 24,000 15;200 <br /> Notes: .,.a From Table 12-1,Specific Plan Ill(EDAW,2005a). gpd=gallons per day. du=dwelling unit. <br /> a From Table 13-1,Specific Plan I11(EDAW,2005a),with conservation. <br /> Unit wastewater generation rate is the same or more than unit water demand rate,which is impossible. <br /> Adequate WTP and WWTP capacity; water mains, storage tanks,pump stations, and water <br /> distribution pipelines; and sanitary sewers would all be constructed to serve the proposed <br /> project before the residences could be occupied. Pipelines would be extended south from <br /> i neighborhoods in which they are currently installed along Central Parkway and F Street(as <br /> designated on the tentative map prepared by Siegfried Engineering, 2006). Construction of <br /> utility infrastructure within the project site would occur prior to paving the streets and <br /> completing the houses and buildings. The sanitary sewer and storm drain would exit the <br /> project site via a 15-foot wide easement between two lots at the north end of Court B. These <br /> utility improvements have been subjected to previous separate environmental impact <br /> assessments as required by CEQA including the SPIIIEIR. These assessments have <br /> identified impacts that may be potentially significant and proposed mitigation measures to <br /> reduce the impacts to less-than-significant levels. Therefore,a less-than-significant impact <br /> would occur with respect to construction and expansion of water and wastewater facilities to <br /> serve the proposed project. <br /> 4-82 <br />