i <br /> MOUNTAIN MOUSE PROPOSED ALTAMONT HEIGHTS TENTATIVE MAP 4.ENVIRONMENTAL CHECKLIST <br /> 4.16 UTILITIES AND SERVICE y <br /> • The'agreement between MHCSD and BBID allows BBID to supply more than 0,413 afy <br /> to MHCSD if BBID has excess water available. Projections of all the future dernands'for <br /> BBID are presented in Table 1 of the WSA The projections indicate that BBID would <br /> have 262 afy ofe'xcess water,in the year 2025 (50,000 afy 49,73$afy) However,the <br /> future demands include 4,616 afy`for the East Altamont Energy Center This project has <br /> been.terminated. Therefore; BBID would have 4,$78, afy(262 afy+4,616.afy}of excess <br /> available supply"in normal years. Therefore, BBID could supply an additional 25.7 afy to <br /> MHCSD to satisfy the excess demand descnbed above in mos#years. <br /> • The MHMP states that lands north of Byron Road between the El Peseado Grant Line <br /> and Old.River have riparian water rights amounting to 2,600'afy that could be used on <br /> these lands if the land owners choose to enter into'a transfer..agreement with BBID. - <br /> Mountain House Community Neighborhoods I'through L are located in this area: It <br /> should be noted that these riparian rights could be curtailed by DWR during a water <br /> shortage in dry years. , <br /> • Chapter 2 of MHCSD Ordinance 4056 establishes five stages of water allocations.(i.e., <br /> rationing)that could be enacted to reduce demand during water shortage emergencies. <br /> The amount of water conservation that is actually achieved will be an important factor in <br /> providing a reliable water supply to meet future demands. Specific Plan III Implementation <br /> Measure 12.2.3.e states that water use shall be monitored continuously and adjustment to <br /> supply made as necessary asdirectedby the MHCSD. <br /> i <br /> The WSA states that Specific Plan III's proportionate share of the 257 afy shortfall is 41 afy. <br /> In response to this conclusion, Specific Plan III proponents proposed that an additional 60 afy <br /> of non-potable water would be provided to the College Park site by BBID for landscape <br /> irrigation. With construction of this non-potable water system,adequate additional water <br /> would be provided to make up the 41-afy shortfall identified in the WSA. Therefore, <br /> adequate water would be provided to serve the proposed project,and a less-than-significant <br /> impact would occur. , <br /> e) Result in a determination by the wastewater treatment provider which serves or may <br /> serve the project that it has adequate capacity to serve the project's projected demand <br /> in addition to the provider's existing commitments? <br /> The MHCSD, the wastewater treatment provider for the Mountain House Community, does <br /> not have a commitment to provide wastewater treatment for any community or area other <br /> than the MHMP area. The MHCSD may provide wastewater treatment to existing houses on <br /> the south side of Grant Line Road(Grant Line Village) and the south bank of Old River ver if i <br /> those property owners choose to annex to the MHCSD, but the amount of wastewater <br /> generated by these houses would be small. Future expansions of the WWTP are discussed in <br /> SPIIIEIR. Since these expansions must occur prior to occupancy of houses or buildings in <br /> the progressive development of Specific Plan I, Specific Plan If, and Specific Plan III, the <br /> MHCSD would always have adequate wastewater treatment capacity. Therefore, adequate <br /> wastewater treatment capacity would be provided to serve the proposed project, and a less- <br /> than-significant impact would occur. <br /> 4-84 <br />