My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006255
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
20058
>
2600 - Land Use Program
>
PA-0600365
>
SU0006255
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2019 1:28:24 PM
Creation date
9/5/2019 10:46:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006255
PE
2638
FACILITY_NAME
PA-0600365
STREET_NUMBER
20058
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
MOUNTAIN HOUSE
APN
20907026
ENTERED_DATE
9/15/2006 12:00:00 AM
SITE_LOCATION
20058 W GRANT LINE RD
RECEIVED_DATE
9/12/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\20058\PA-0600365\SU0006255\CDD OK.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1071
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c. .1.02 acres of wetland will be filled as a result of the project(Draft <br /> Wetland Delineation Report Golden State.Investments ll, LP Property <br /> February 2006). The applicant shall replace.the lost wetland with 1.02 <br /> acres of wetland (General Plan,Volume I, Policy VI,,G, 5; Master Plan, <br /> Implementation 7.3.6 (b)). <br /> 0. A; <br /> d The Wetland Plan shall be consistent with alf Federal,.State, and local <br /> regulations (Master Plan,Implementatipn 7.3.6(k);-Specific Plan III, <br /> Implementation Measure 7.3.4.3(e)). <br /> e. The Wetland Plan shall show the location and extent.of existing wetlands <br /> on the site of the proposed project. <br /> f. The Wetiand Plan shall indicate sites that are to be developed or <br /> preserved to serve as mitigation for loss of wetlands as a result of the <br /> proposed project. To the extent practical, mitigation sites shall be in the <br /> Mountain House Creek corridor. If replacement in theMountain House <br /> Creek corridor is not feasible, replacement shall be within San Joaquin <br /> Cdunty. <br /> g. Provisions shall be made for maintaining replacement wetland for a <br /> minimum of five (5) years. <br /> h. Assurance of wetland preservation shall be by conservation easement or <br /> other acceptable methods. <br /> In addition to the above,with regard to riparian habitat,the applicant will <br /> prepare a Riparian Habitat Mitigation Plan for the elimination of riparian habitat <br /> on the site, pursuant to Community Development Department Condition of <br /> Approval#38 for Major Subdivision Application PA-0600363. Riparian habitat <br /> generally does not include wetlands(see Section 9-110.4 of the San Joaquin <br /> County Development Title); however,to the extent that the elimination of any <br /> wetlands habitat on the site is compensated by the Riparian Habitat Mitigation <br /> Plan, the compensation provided by the Riparian Habitat Mitigation Plan would <br /> serve as mitigation for the loss of the wetlands. <br /> With respect to the Master Plan/Specific Plan III,the consistency review found <br /> that the proposed subdivision addresses the affordable housing objectives <br /> expressed in these plans by meeting Master Plan/Specific Plan III requirements <br /> for housing diversity and affordability,and density of development(within the <br /> Minimum and Maximum density range for the R/L and the R/M'land use <br /> designations for Neighborhood AIB, per Master Plan Section 3.3. To meet Master <br /> PlanlSpecific Plan III requirements regarding noise,future residents of the <br /> subdivision will be protected from excessive outdoor and indoor noise levels via <br /> landscaping,wall treatments,and construction requirements for homes. To <br /> promote greater energy efficiency and accessibility in accordance with Master <br /> Plan requirements,development of the subdivision incorporates a number of <br /> design features. <br /> With respect to the Public Financing Plan,the consistency review has determined <br /> the proposed subdivision is consistent with said plan because: 1)development <br /> of the subdivision will finance the pro-rata cost of infrastructure needed to serve <br /> it,through a combination of impact fees, monthly utility charges,special taxes <br /> and MHCSD special taxes; and 2)development of the subdivision will pay the <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.