My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006255
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
20058
>
2600 - Land Use Program
>
PA-0600365
>
SU0006255
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2019 1:28:24 PM
Creation date
9/5/2019 10:46:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006255
PE
2638
FACILITY_NAME
PA-0600365
STREET_NUMBER
20058
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
MOUNTAIN HOUSE
APN
20907026
ENTERED_DATE
9/15/2006 12:00:00 AM
SITE_LOCATION
20058 W GRANT LINE RD
RECEIVED_DATE
9/12/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\20058\PA-0600365\SU0006255\CDD OK.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1071
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
g- Fencing, signage or other suitable measures to minimize noise, spray drift and <br /> limit the potential for trespass on agricultural lands and BBID facilities: <br /> In addition the plan shall address.the following: <br /> h- Chemical applications; and '} <br /> i. Dust management.. , <br /> Timing: Condition shakI be met prior to approval-of the Final Map. (MP policies 3.2.4 g), h} <br /> and i)and Specific.Plan III Implementation Measure,3.2A'13.d'and e] <br /> 18. Right To Far'm`Recorclatiori And Notification: The deed of each parcel shall include the <br /> F following recording notification,as specified by San .loaquin`County Ordinance 4217 which <br /> added Section 6-9004 et. seq. to Chapter 1 of Division 9 of the San Joaquin County <br /> Ordinance Code regarding the Right to Farm Notice:"All persons purchasing lots•within the <br /> boundaries of this approved map should be prepared to accept the inconveniences or <br /> discomforts associated with agricultural operations or activities,such as noise,odors,insects, <br /> dust or fumes. San Joaquin County has determined that such inconveniencies or discomforts <br /> shall not be considered to be a nuisance:" ['Implementation Measure 3.2.4.3.f] <br /> Timing: Prior to approval of Final Map(s). <br /> NOISE <br /> 19..Increase Traffic Noise: Before occupancy of the first residence at College Park, a noise <br /> barrier shall be constructed by the College Park developers between the five existing <br /> residences located on the north side of Grant Line Road between Central Parkway and the <br /> Alameda County line (Receptor 14 in Figure 4:13-2 of the College Park Final EIR)and the <br /> northern travel lane of Grant Line Road. The noise barriers may consist of a wall, berm, or <br /> combination thereof. The exact location, height, and character of the noise barrier shall be <br /> n determined by a noise consultant approved by the County. The sound barrier shall reduce <br /> outdoor noise levels at the center of the front yards of the five existing residences to below 65 <br /> dBA Ld,1CNEL. If Grant Line Road is widened at this location subsequent to construction of <br /> the sound barrier but before removal of the five residences under Specific Plan II, the sound <br /> barrier shall be relocated, as required. If the five existing residences are removed under <br /> Specific Plan II before occupancy of the first residence under the College Park project, this <br /> mitigation measure shall not require implementation. This mitigation shall be funded through <br /> fair-share payments by the College Park developers. [MM 4-13-3] <br /> Timing: Design submitted with Improvement Plans for first Final Map and compliance verified <br /> prior to the issuance of building permits. <br /> 20. Traffic Noise---Arterials: Before occupancy of the first residence proposed under the <br /> College Park project along each of the seven arterial segments identified in Table 4.13-11 of <br /> the College Park Final EIR, a sound barrier shall be constructed by the College Park <br /> developers along that arterial segment. The noise barrier may consist of a wail, berm, or <br /> combination thereof. The exact location, height and character of the sound barrier shall be <br /> determined by a noise consultant approved by the County. The sound barrier shall reduce <br /> outdoor noise levels at the center of backyards of proposed adjacent single-family residences <br /> to below 65 dBA LddCNEL and as close to 60 dBA Ldn/CNEL as feasible. This mitigation <br /> shall be funded through fair-share payments by the College Park developers. [MM4.13-4] <br /> Timing: Design submitted with Improvement Plans and compliance verified prior to <br /> recordation of the first Final Map. <br /> i <br /> 21. Outdoor Noise Levels: Best available noise reduction measures shall be implemented by <br /> the applicant to reduce noise levels in primary outdoor use areas (backyards) of new <br /> residential development to an Ldn of 60 dB. The subdivider shall specify what reasonable <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.