My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006255
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
20058
>
2600 - Land Use Program
>
PA-0600365
>
SU0006255
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2019 1:28:24 PM
Creation date
9/5/2019 10:46:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006255
PE
2638
FACILITY_NAME
PA-0600365
STREET_NUMBER
20058
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
MOUNTAIN HOUSE
APN
20907026
ENTERED_DATE
9/15/2006 12:00:00 AM
SITE_LOCATION
20058 W GRANT LINE RD
RECEIVED_DATE
9/12/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\20058\PA-0600365\SU0006255\CDD OK.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1071
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> i <br /> feet from white-tailed kite nesting areas shall be established and maintained during the <br /> M nesting season for the period encompassing nest building and continuing untii,fledglings <br /> leave nests.`This setback applies whenever`cons#ruction or other ground dlsturbErig-activities <br /> F must begin during the nesting season in the presence of nests that a're knowri'to be •F:. <br /> occupied. Setbacks shall be marked by brightly colored temporary fencing <br /> Northern Harrier' If protect consiruction'begins during.the nestin1.g season {�ebruary-15= <br /> AuguM'31),pre-construction-surveys shall tie conducted during the nestJng`season in <br /> -'suitable nesting habitat within 500 feet of'areas of protect activity Thesurvey,shall tie <br /> conducted within the.2 Week's before construction begins._ A setback 'f 500.feet from:;' `- <br /> -northern harrier nestingareas shall be established and marntaiiied during the`nesting season <br /> t for the period encompassing nest building'and continuing until) e Ings {cave nests .This <br /> 1 <br /> setback'applies whenever construction or other ground-disturbing activities:must begin during <br /> the nesting,season} iii the`presernce of nests that are known to tie occupied 'Setbacks shall <br /> be marked by brightly colored ierriparary fencing. <br /> Common Raptors. If project construction begins during the nesting season'(February 15- <br /> August 31), pre-construction surveys shall be conducted during the nesting season in <br /> t suitable nesting habitat within 500 feet of areas of project,activity. ,Thesurvey shall be <br /> conducted within the 2 weeks before construction or tree removal begins, If any active nests <br /> are.found, a setback of 200 feet from each nest shall be established and maintained during <br /> the nesting season for the.period encompassing nest building.and continuing until fledglings <br /> leave nests. This setback applies whenever construction or other ground disturbing activities <br /> must begin during the nesting season in the presence of nests that are known 40be <br /> occupied. Setbacks shall be marked by brightly colored temporary fencing. (MM 4.10-6) <br /> Timing: The applicant shall submit a biologist's report of pre-construction surveys to the San <br /> Joaquin County Community Development Department(CDD)prior to the issuance of grading <br /> permits for the project. <br /> 33. Conversion of Other Special Status Nesting Bird Habitat: During the SJMSCP application <br /> process, SJCOG will determine whether that specific project site supports suitable habitat for <br /> loggerhead shrike, California horned lark, or tricolored blackbird. If SJCOG determines <br /> suitable habitat is present on or adjacent to a given project site, the following SJMSCP <br /> incidental take avoidance and minimization measures shall be implemented by the project <br /> applicants in consultation with a qualified biologist. <br /> Loggerhead Shrike. if project construction begins during the nesting season (April 1-August <br /> 31), pre-construction surveys shall be conducted during the nesting season in suitable <br /> nesting habitat within 100 feet of areas of project activity. The survey shall be conducted <br /> within the 2 weeks before construction or tree removal begins. A setback of 100 feet from <br /> F loggerhead shrike nesting areas shall be established and maintained during the nesting <br /> season for the period encompassing nest building and continuing until fledglings leave nests. <br /> This setback applies whenever construction or other ground-disturbing activities must begin <br /> during the nesting season in the presence of nests that are known to be occupied. Setbacks <br /> i <br /> shall be marked by brightly colored temporary fencing. <br /> California Horned Lark and Tricolored Blackbird. if project construction begins during the <br /> nesting season (April 1-August 31), pre-construction surveys shall be conducted during the <br /> nesting season in suitable nesting habitat within 500 feet of areas of project activity. A <br /> setback of 500 feet from California horned lark and tricolored blackbird nesting areas shall be <br /> established and maintained during the nesting season for the period encompassing nest <br /> building and continuing until fledglings leave nests. This setback applies whenever <br /> construction or other ground-disturbing activities must begin during the nesting season in the <br /> presence of nests that are known to be occupied. Setbacks shall be marked by brightly <br /> k colored temporary fencing. (MM 4.10-7) <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.