Laserfiche WebLink
J. If"F"Street at Delta College is closed, the terminus of"F"Street a"Cul-de;sac will need <br /> to be installed to allow fire and emergency equipment as well as moving vans to turn <br /> around without having to.back out, using a 45,foot turn radius at minimum. An <br /> alternative turn around.maybe submitted,to:MHCSD for review and.approval <br /> K. Construct"F"Street from Central Parkway to the North property line of Delta.College <br /> campus prior to issuance of first building permit. <br /> L. The Right Of Way.of'F Street shall be secured prior to flingof the.Final Map. <br /> M. Signs, Striping,.and Pavement Markings; and other traffic.control devices shy ' conform <br /> to the'Federal MUTCD as amended by the California Supplement <br /> and-as:-stipulated in <br /> the MHCSD Standard Details and Specifications. <br /> N. Advance street name signs, shall be'provided and installed,on,Central Parkway,on the <br /> approaches to"F" Street(east and west bound)and westbound approaching"C"and"E" <br /> Street entrances to Altamont Heights. <br /> O. A traffic signal shall be installed at the intersection of"F"Street-and Central.-Parkway <br /> prior the issuance.of the first building permit. <br /> P. Trees installed shall have a minimum setback of 11-feet from traffic control signs. <br /> Q. Sight distance and intersection visibility and clearance.shall be providedf in accordance <br /> with MHCSD Standard Details 280, 281, and 282. This should be a consideration <br /> included in the proposed design of the retaining walls at intersections, and landscaping <br /> plans. Visibility shall be maintained within the sight triangle. <br /> R. Unless the project has already been constructed or bonding for the project exists to the <br /> satisfaction of the MHCSD, the applicant shall bond and construct the phases of a four- <br /> lane 1-205 freeway overpass,as shown in the Master Plan and the projects traffic study, <br /> for Mountain House Parkway per Caltrans and MHCSD standards;construction may be <br /> phased. Timing:funding or bonding prior to or with approval of first Final Map for Tract <br /> 3646; first phase construction completion prior to issuance of the first residential building <br /> permit within Tract 3646. <br /> i <br /> S. The applicant shall bond and construct on a phased basis applicable roadway sections <br /> as depicted on the Tentative Map per MHCSD standards with appropriate approach and <br /> departure intersection channelization. Timing: funding or bonding prior to approval of <br /> each affected Final Map for Tract 3646 as determined by the MHCSD;construction <br /> commencement prior to issuance of first residential building permit in Tract 3646 that <br /> warrants the improvements as determined by MHCSD. <br /> T. Street Improvements. All streets within the development and as shown on the Tentative <br /> Map shall be improved by the developer according to the following: <br /> a._ Standard Policy: As a condition for allowing the subdivision, the MHCSD requires <br /> the subdivider to improve all streets shown on the Tentative Map as well as other <br /> public rights-of-way that may be created to facilitate the development in accordance <br /> with the Community Approvals and the trafficstudy, as required by the Master <br /> Acquisition and Reimbursement Agreement. The street improvements shall include <br /> all street pavement, curbs, gutters, sidewalks, landscaping, lighting, signs, <br /> underground utilities, etc. <br /> b. Allowed Exception to the Standard Policy: The MHCSD may allow partial street ' <br /> improvements for roads associated with the Tentative Map. Under this exception, i <br /> the completion of the full street improvements will be the responsibility of future i <br /> adjacent developments. 'For this exception, the developer shall be required to <br /> f <br /> i <br /> 19 <br /> l <br />