Laserfiche WebLink
B. The developer shall build the required drainage system and water quality basins and <br /> improve the creek as required by MHCSD to accommodate runoff from the project. The <br /> developers shall expand-WQBI as required by MHCSD to acconimodate'rurioff from the <br /> project before development of those,portions:are.10 be.'sefved by tt e:DeAnza':Boulevard <br /> y :x.and.Mountain House Parkway storm-drain systems .The basin shall be`exparidec!to a <br /> capacity necessaryt#o serve Tract<N6. 3646 The configuration shall.be' ail" the <br /> Storm Water,Master:Plan'lJpdate.TY The Water Quality`Basiri'shal!'be iled'icated to <br /> MHCSD <br /> r <br /> ,C "Water Decontaminator"Model. ;l.Ox f8A as;manufactueed by-Inventive Resources or. <br /> approyed equal catch basin inserts shall be installed prior,to issuance`of the`first building <br /> permit.: The budder.shall be responsible for the rr►aintehance.and repair of all catch <br /> basin inserts iri t6lle'd within-the'right-of way,t4ntit'construction is-complete' <br /> r 24 Water.Qualit Basins Mos uito Abat. ant:..Plans-for the�mplemen#a66ri and <br />` maintenance of the water,quali#y basins and any other;storm.dranage€acilities involving <br /> open bodies of water shall be reviewed and approved by the MHCSD and if required,by the <br /> MHCSD,reviewed by the mosquito Abatement District. Condition shall be met before <br /> approval of,frM f=inal Map, <br />€ 25. Utilities: <br /> A. The Developers and contractors:shall.comply with Ordinance No. 4162 "Street Opening <br /> and Pavement Restoration Regulations". <br /> B. When any portion of an arterial street is to be included in a development's construction <br /> plans, then all of the buried utilities that are ultimately planned to be within the <br /> improvement area shall be installed as part of the.street improvement project regardless <br /> if any of the utilitiesare required for any phase of the development associated with the <br /> street construction. Conduits or sleeves may be installed in lieu of the buried utility if <br /> approved by.the MHCSD. <br /> C. Any phased development shall install all"in-tract"utilities required to serve it . <br /> development. In addition,if any future adjacent or nearby phases of the development, <br /> or adjacent Neighborhoods, will depend on obtaining service from such utilities, then the <br /> utility lines shall be sized to serve these future developments. Any utility lines that are <br /> intended to be used by an adjacent development or Neighborhood shall be installed up <br /> to the phase or Tentative Map boundary line to make it available for future extension.To <br /> recoup all or a portion of any over sizi ng.costs, the developer may request the MHCSD <br /> to process a reimbursement agreement pursuant to the MARA. <br /> D. When public utilities are to be located outside public rights-of-way but within the <br /> Tentative Map boundary, the developer shall provide public utility easements for these i <br /> utilities. The easements shall be shown on all Final Maps and parcel maps. <br /> E. Prior to the submittal of improvement plans for the development, the developer shall <br /> submit to the MHCSD composite schematic plans for in tract storm drains, sanitary <br /> sewers, and water distribution facilities, s <br /> F. Electrical transformers within residential Neighborhoods shall be in underground vaults, <br /> subject to MHCSD and Modesto Irrigation District(MID) requirements. The developer <br /> shall pay for any incremental costs relating to undergrounding transformers not paid for <br /> by MID. Transformers located in the downtown area, commercial and industrial areas <br /> may be placed above ground provided they'aro aesthetically designed and/or shielded <br /> by landscaping subject to MHCSD and MID requirements. <br /> 23 i <br />