Laserfiche WebLink
Mm <br /> D <br /> > College Park at Mountain House Specific Plan.III <br /> ' Mitigation Monitoring and Reporting Program <br /> oImplementation&Verification <br /> Implementation <br /> E Mitigation Measure Timing/Schedule Responsibility Action Date <br /> Completed <br /> 4,6-3 Cultural Resources—Potentlal to Uncover Human During construction SJCCDD, in <br /> Remainsconjunction with the <br /> ro developer,and in <br /> � In accordance with the California Health and Safety P <br /> 2% Code, if human remains are uncovered during conjunction with <br /> cn construction at the project site,the College Park qualified archaeologist <br /> `o developer or construction contractor shall immediately and County Coroner, <br /> halt potentially damaging excavation and notify if needed, <br /> SJCCDD. The County shall,in tum, immediately <br /> notify the San,Joaquin County coroner of the find.The <br /> coroner is required to examine all discoveries of <br /> human remains within 48 hours of receiving notice of <br /> a discovery on private or state lands(HSC Section <br /> Q, 7050.5[b]). If the coroner determines that the remains <br /> are those of a Native American,he or she shall contact <br /> the Native American Heritage Commission(NAHC) <br /> by phone within 24 hours of making that <br /> t� determination(HSC Section 7050[c]).Once a Most <br /> Likely Descendent(MLD)has been designated by the <br /> ro NAHC,the MLD, in consultation with the County, <br /> shall determine the ultimate disposition of the remains. <br /> The responsibilities of the County for acting upon <br /> notification of a discovery of Native American human <br /> o remains are outlined in detail in the PRC Section <br /> 5097,9. Measures likely resulting from theabove. <br /> °i could include preservation in place and <br /> a <br /> z capping/avoidance, or removal and continued <br /> m N monitoring of ground-disturbing activities. <br /> L 4.7 DRAINAGE <br /> 4.7-2 Drainage--Result in Flooding or Exceed the Before construction MHCSD,in <br /> . � conjunction with-the <br /> Capacity of the Storm-drain System developer <br /> o The College Park developers shall expand WQB1 as <br /> a required to accommodate runoff from the College <br /> Park project,or shall provide the required on-site <br />