Laserfiche WebLink
� o <br /> College Park at Mountain House'Specific Plan III <br /> Mitigation Monitoring.and Reporting Program <br /> o ImplemenWon,4 Verification <br /> a Mitigation Measure Timing/Schedule Implementation pate <br /> Responsibility Action <br /> Completed <br /> cmaintenance responsibilities; <br /> < Specify the pollutants that are Iikely to be used <br /> during construction that could be present in <br /> stormwater drainage and non-stormwater <br /> discharges; <br /> o < Specify BMP inspection protocols to ensure that <br /> the BMPs are effective and ensure that the <br /> monitoring is conducted if nonvisible pollutants <br /> are inadvertently discharged into stormwater. <br /> < Identify construction techniques that will reduce <br /> the potential for runoff; <br /> < Identify the erosion and sedimentation control <br /> cc measures to be implemented; <br /> < Specify spill prevention and contingency <br /> measures; <br /> < Identify the types of materials used for <br /> a equipment operation; <br /> w < Identify measures to prevent or clean up spills of <br /> CD hazardous materials used for equipment <br /> -n <br /> operation and hazardous waste; <br /> < Identify emergency procedures for responding to <br /> spills; <br /> < Identify BMPs that shall be used in all <br /> subsequent site-development activities; <br /> z <br /> < identify personnel training requirements and <br /> c procedures that will be used to ensure that <br /> Ct) workers are aware of permit requirements and <br /> C_ proper installation and performance inspection. <br /> c methods for specified BMPs; <br /> < Identify the appropriate personnel responsible for <br /> a -U supervisory duties related to implementation of <br /> v <br /> _ the SWPPP;and <br /> < Require all construction contractors to retain a <br /> H <br />