Laserfiche WebLink
M <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Implementation <br /> implementation.&Verification <br /> g' Mitigation Measure Timing/Schedule Responsibility Action Date <br /> �• Completed <br /> in <br /> nrequirements from the County Environmental <br /> Health Department.Dairy waste ponds or any <br /> other sources of contamination shall be removed <br /> under a qualified hazardous materials expert in <br /> accordance with applicable regulations and <br /> arequirements from the Central Valley RWQCB or <br /> the California Department of Toxic Substances. <br /> This includes the December 4,2003 crude oil <br /> releases and any migration of it to the project site. <br /> The soil underlying these facilities shall be <br /> sampled and tested by the experts, If the testing <br /> reveals contamination, the regulatory agencies <br /> a shall be contacted,any recommendations by the <br /> a <br /> experts shall be implemented,and regulating <br /> agency shall identify"no further action"before <br /> project construction. <br /> o < Other potential existing sources of contamination <br /> cc (i,e.,septic systems,refuse piles,waste ponds, <br /> Un <br /> electrical transformers containing PCBs)on the <br /> project site and off-site infrastructure sites shall be <br /> identified and removed under the supervision of <br /> qualified hazardous materials experts and in <br /> o accordance with applicable regulations before <br /> construction.The applicant shall demonstrate to <br /> the County Environmental Health Department that <br /> n_ the above has taken place before issuance of <br /> building permits.If the experts observe potential <br /> soil contamination or noxious odors associated' <br /> with these facilities, the soils underlying these <br /> facilities shall be sampled and tested by the <br /> experts, If the testing;reveals contamination,the <br /> regulatory agencies shall be contacted,any <br /> recommendations made by the experts shall be <br /> implemented, and the County Environmental <br /> .._. �...�. r+» rte+• �.�+ w+" w.q o.r. It <br />