cn n <br /> m o <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring.and Reporting Program <br /> Implementation Implementation Verification <br /> o Mitigation Measure Timing/Schedule p <br /> Responsibility Action Date <br /> Completed <br /> employing one of several methods outlined in <br /> o Section 5.2.4.15 of the SJMSCP.These include <br /> N retention of tail vegetation,regular discing of the <br /> `° site, or use of chemicals or traps to kill ground <br /> 0 <br /> squirrels; <br /> ► Pre-construction surveys for burrowing owls <br /> 0 shall be conducted where project construction <br /> activities would occur within 75 meters of <br /> suitable habitat(based on SJCOG review).The <br /> survey shall be conducted within 2 weeks of the <br /> beginning of construction. If burrowing owls are <br /> found,the following measures shall be <br /> y implemented; <br /> During the nonbreeding season(September 1 <br /> through January 31),burrowing owls <br /> occupying the project site shall be evicted <br /> from the project site by passive relocation,as <br /> described in the DFG's Staff fJ`'Report on <br /> Burrowing Owls(DFG 1995). <br /> d <br /> • During the breeding season(February 1 <br /> through August 31), occupied burrows shall <br /> not be disturbcd and shall be provided with a <br /> 0 250-foot protective buffer until and unless <br /> ' the Technical Advisory Committee,with the <br /> concurrence of the permitting agencies' <br /> a representatives on the Technical Advisory <br /> ro Committee,or a qualified biologist approved <br /> by the permitting agencies,verifies through <br /> noninvasive means that either(1)the buds <br /> have not begun egg laying or(2)juveniles <br /> ern from the occupied burrows are foraging <br /> independently and are capable of - <br /> independent survival. After the fledglings <br />