My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006255
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
20058
>
2600 - Land Use Program
>
PA-0600365
>
SU0006255
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2019 1:28:24 PM
Creation date
9/5/2019 10:46:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006255
PE
2638
FACILITY_NAME
PA-0600365
STREET_NUMBER
20058
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
MOUNTAIN HOUSE
APN
20907026
ENTERED_DATE
9/15/2006 12:00:00 AM
SITE_LOCATION
20058 W GRANT LINE RD
RECEIVED_DATE
9/12/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\20058\PA-0600365\SU0006255\CDD OK.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1071
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M <br /> w College Park at Mountain House Specific Platt III <br /> Mitigation Monitoring and Reporting Program <br /> 0 Irnplementatton <br /> Implementation'&Vei&3tion <br /> o, Mitigation Measure Timing/Schedule Responsibility Action Date <br /> Completed <br /> Do- Before project activity,USFWS shall be consultation with <br /> consulted to determine whether widening of USFWS <br /> Grant Line Road has potential to adversely affect <br /> 0, California red-legged frog.It may be necessary <br /> to conduct a formal habitat assessment and <br /> surveys to make such a determination.If it is <br /> determined that adverse effects are unlikely to <br /> occur,no further mitigation shall be required. <br /> < If it is determined that adverse effects to <br /> California red-legged frog could occur, <br /> consultation with USFWS shall be conducted,and <br /> authorization for incidental take could be required. <br /> rn Specific mitigation measures would be developed <br /> during the consultation process.Measures <br /> designed to avoid and minimize take to the <br /> greatest extent feasible shall be developed and <br /> o implemented.'These may include limiting <br /> CD activities to certain seasons,minimizing <br /> ro vegetation removal and in-water construction <br /> _0 activities, conducting pre-construction surveys, <br /> and conducting daily surveys and monitoring of <br /> construction areas.If necessary, appropriate <br /> ncompensation for loss of habitat and other adverse <br /> effects would also be developed.This could <br /> °i include measures such as enhancement of existing <br /> z habitat and creation of additional habitat. <br /> o <br /> Swainson's Hawk Before construction SSCOG;in' <br /> cn < If project construction begins during the {surveys shall be consultation with DFG <br /> Wm Swainson's Hawk nesting season,as defined by conducted 2 weeks <br /> S DFG(March I to September 15),pre-construction prior to construction <br /> o surveys shall be conducted in areas of suitable activities) <br /> nesting habitat within 0.5 mile of project activity. <br /> Surveys shall be conducted by a qualified <br /> rrrw PEENA OEM"" /�� !� �+ wmaw" _W" 7_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.