Laserfiche WebLink
CD <br /> W (D College Park at Mountain Housee-Specifiic Plari III <br /> Mitigation Monitoring and Reporting Program <br /> C) ¢' implementation Implementation&lferlftcation. <br /> c Mitigation Measure Timing/Schedule <br /> c Responsibility Action Date <br /> Completed <br /> 4.24.2 Visual Quality—Alteration.of a Scenic Vista from During and after MHCSD <br /> Mountain House Parkway construction <br /> The following measures shall be implemented by the <br /> m College Park developers: <br /> ro < If the landscaping and edge treatments required' <br /> by the WIMP and MHCSD Design Manual have <br /> not been developed on the east side of Mountain <br /> House Parkway fronting the Pombo property by <br /> Specific PIans I or II at the time the proposed <br /> pond is developed on the Pombo property,the <br /> required landscaping and edge treatments.on the <br /> east side of Mountain House Parkway in the <br /> vicinity of the proposed pond shall be installed <br /> by the College Park developers, This shall be <br /> done concurrent with development of the pond. <br /> If the aboveground pond option is,developed,the <br /> west-facing pond berm shall be densely landscaped <br /> iz by the College Park developers. In addition, the berm <br /> shall be constructed by the College Park developers <br /> using contoured and rounded slopes to avoid-angular <br /> face slopes. This shall be done concurrent with <br /> o development of the pond. <br /> O <br /> t� <br /> d <br /> (D <br /> SCS <br /> o m <br /> cn p <br />