My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006255
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
20058
>
2600 - Land Use Program
>
PA-0600365
>
SU0006255
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2019 1:28:24 PM
Creation date
9/5/2019 10:46:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006255
PE
2638
FACILITY_NAME
PA-0600365
STREET_NUMBER
20058
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
MOUNTAIN HOUSE
APN
20907026
ENTERED_DATE
9/15/2006 12:00:00 AM
SITE_LOCATION
20058 W GRANT LINE RD
RECEIVED_DATE
9/12/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\20058\PA-0600365\SU0006255\CDD OK.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1071
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U) 0 <br /> � o <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring.and Reporting Program <br /> - Implementation&Verification <br /> 0 a) Implementation <br /> Mitigation{Measure Timing/Schedule Responsibility Action Date <br /> Completed <br /> employing one of several methods outlined in <br /> z Section 5.2.4.15 of the SJMSCP.These include <br /> Gretention of tall vegetation,regular discing of the <br /> m site,or use of chemicals or traps to kill ground <br /> squirrels; <br /> CD <br /> Pre-construction surveys for burrowing owls <br /> shall be conducted where project construction <br /> activities would occur within 75 meters of <br /> suitable habitat(based on SJCOG review),The <br /> survey shall be conducted within 2 weeks of the <br /> beginning of construction.If burrowing owls are <br /> found,the following measures shall be <br /> implemented; <br /> • During the nonbreeding season(September I <br /> through January 31),burrowing owls <br /> occupying the project site shall be evicted <br /> from the project site by passive relocation, as <br /> described in the DFG's Staff Report on <br /> Burrowing Owls(DFG 1995). <br /> a <br /> • During the breeding season(February 1 <br /> through August 31),occupied burrows shall <br /> not be disturbed and shall be provided with a <br /> 6 250-foot protective buffer until and unless <br /> 5' the Technical Advisory Committee,with the <br /> concurrence of the permitting agencies' <br /> i <br /> representatives on the Technical Advisory <br /> Committee,or a qualified biologist approved <br /> $ by the permitting agencies,verifies through <br /> noninvasive means that either(1)the birds <br /> `Q have not begun egg laying or(2)juveniles <br /> m from the occupied burrows are foraging <br /> a independently and are capable of <br /> independent survival.After the fledglings <br />
The URL can be used to link to this page
Your browser does not support the video tag.