My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006255
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
20058
>
2600 - Land Use Program
>
PA-0600365
>
SU0006255
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2019 1:28:24 PM
Creation date
9/5/2019 10:46:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006255
PE
2638
FACILITY_NAME
PA-0600365
STREET_NUMBER
20058
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
MOUNTAIN HOUSE
APN
20907026
ENTERED_DATE
9/15/2006 12:00:00 AM
SITE_LOCATION
20058 W GRANT LINE RD
RECEIVED_DATE
9/12/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\20058\PA-0600365\SU0006255\CDD OK.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1071
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> MOUNTAIN HOUSE PROPOSED ALTAMONT HEIGHTS TENTATIVE MAP 4. ENVIRONMENTAL CHECKLIST <br /> 4.8 HYDROLOGY AND WATER QUALITY <br /> Update,Addendum I(PACE, 2004). Drainage infrastructure includes primary and secondary <br /> storm drain systems,improvements to Water Quality Basin(WQB)No. 1, and improvements <br /> to Mountain House Creek. New drainage infrastructure would be constructed to convey <br /> runoff from the Specific Plan III area,in which the project site is located. Discussion of <br /> storm drainage facilities for the proposed project is included in Section 416: Utilities and <br /> Service Systems. <br /> SIGNIFICANT IMPACTS IDENTIFIED IN 2005 SPIIIEIR <br /> The SPIIIEIR identified five drainage and water quality impacts.Three,involving increased <br /> -- erosion and sedimentation, dewatering during construction, and long-term water quality <br /> effects of urban runoff, were determined to be less than significant. The following two <br /> impacts were determined to be potentially significant: <br /> Impact 4.7-2: Result in Flooding or Exceed the Capacity of the Storm-drain <br /> System. [Specific Plan III development] would increase the rate and amount of <br /> surface runoff and both increase the demand for capacity in the existing downstream <br /> MHMP storm-drain system and require the development of new storm-drain facilities <br /> to serve the [development]. However,this would not result in flooding or exceeding <br /> the capacity of the MHMP storm-drain system because the existing downstream <br /> MHMP storm-drain system has already been sized to accommodate runoff from the <br /> [development]. [New] projects would provide adequate capacity in the new storm- <br /> drain facilities required to serve [the new projects]. A less-than-significant impact <br /> `-' would occur. [Specific Plan III development] would require expansion of WQB No. <br /> 1 and,if not completed before development, a significant impact would occur. <br /> Impact 4.8-1: Water Quality—Potential Temporary Construction-Related <br /> Water Quality Effects. Temporary construction-related disturbances within the <br /> [Specific Plan III area] could result in the discharge of contaminated stormwater and <br /> �- non-stormwater discharges to drainage systems and ultimately the Mountain House <br /> _ Creek channel and Old River. A potentially significant impact would occur. <br /> i <br /> MITIGATION MEASURES IDENTIFIED IN 2005 SPIIIEIR <br /> Mitigation Measure 4.7-2 requires developers of Specific Plan III to expand WQB No I as <br /> required to accommodate runoff from their proposed projects or provide on-site retention <br /> storage in lieu of the WQB No. 1 expansion. Mitigation Measure 4.8-1 requires developers <br /> of Specific Plan III to prepare Storm Water Pollution Prevention Plans (SWPPPs)that <br /> include effective Best Management Practices (BMPs)to control polluted water discharges <br /> during construction. Implementation of these mitigation measures would reduce potential <br /> flooding and temporary construction-related water quality impacts to a less-than-significant <br /> levels. <br /> E <br /> DISCUSSION REGARDING ,PROPOSED PROJECT <br /> a) Violate any water quality standards or waste discharge requirements? <br /> F� 4-42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.