My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006255
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
20058
>
2600 - Land Use Program
>
PA-0600365
>
SU0006255
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2019 1:28:24 PM
Creation date
9/5/2019 10:46:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006255
PE
2638
FACILITY_NAME
PA-0600365
STREET_NUMBER
20058
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
MOUNTAIN HOUSE
APN
20907026
ENTERED_DATE
9/15/2006 12:00:00 AM
SITE_LOCATION
20058 W GRANT LINE RD
RECEIVED_DATE
9/12/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\20058\PA-0600365\SU0006255\CDD OK.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1071
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
h <br /> FMOUNTAIN HOUSE PROPOSED ALTAMONT HEIGHTS TENTATIVE MAP 4. ENVIRONMENTAL CHECKLIST <br /> 4.15 TRANSPORTATION/TRAFFIC <br /> Ei <br /> Some routes offer subscription bus service. The 1997 Mountain House Community TDM <br /> Program and Transit Plan states that the MHCSD should work to have SMART service <br /> extended to the Mountain House Parkway/Central Parkway park-n-ride lot when 1,000 <br /> houses have been occupied. Additionally, express bus service should be provided to jobs in <br /> 1 Tracy before 44,000 residents live in the Mountain House Community(EDAW, 2005b). <br /> Fi SIGNIFICANT IMPACTS IDENTIFIED IN 2005 SPIIIEIR <br /> The SPIIIEIR identifies two traffic impacts associated with development of Specific Plan III, <br /> of which the proposed project is a part. One, concerning potential traffic safety issues during <br /> construction,was less than significant. The following impact was potentially significant: <br /> Impact 4,1.1-1:Transportation—Effects on 2025 Cumulative With-Project <br /> F1 Conditions on Anticipated Network. This scenario evaluates the traffic impact on <br /> the roadways in the [Specific Plan III] vicinity from the buildout of the proposed <br /> [Specific Plan III] and the remaining portions of the MHMP in the cumulative 2025 <br /> scenario, Under the cumulative 2025 scenario, some of the arterials in the [Specific <br /> Plan III] vicinity are projected to operate at an unacceptable LOS. Without <br /> mitigation,traffic impacts on these roadways would be significant. With <br /> implementation of the mitigation adopted previously for MHMP development, <br /> however,traffic effects on all but two of the arterial segments evaluated would be <br /> less than signifleant. Altamont Pass Road west of Grant Line Road would still be <br /> F! projected to operate at LOS F,resulting in a significant and unavoidable impact. <br /> This result is consistent with the results of the MSIR, Also,Byron Road east of <br /> Grant Line Road is projected to operate at LOS D,while the current acceptable <br /> rlstandard for this roadway segment is LOS C. This segment was not projected to <br /> operate at an unacceptable LOS in the MEIR. The effect on this segment would be <br /> potentially significant. In addition, several freeway segments in the project area are <br /> projected to operate at LOS F, as found in the MEIR. A significant and unavoidable <br /> impact would occur. <br /> MITIGATION MEASURES IDENTIFIED IN 2005 SPIIIEIR <br /> The SPIIIEIR determined that there is no additional mitigation to those provided in the MEIR <br /> that would reduce the 2025 cumulative traffic impact on Altamont Pass Road west of Grant <br /> Line Road and on I-580, I-205,and 1-5 north of 1-205 to a less-than-significant level. Impact <br /> on these road segments would remain significant and unavoidable. <br /> ! 1, <br /> SPIIIEIR Mitigation Measure 4.11-1 states that for consistency with previously adopted <br /> roadway standards, San Joaquin County shall extend the standard of LOS D acceptability to <br /> F1 the segment of Byron Road east of Grant Line Road. It has become more evident in the past <br /> few decades that experiences with best practices and design support the adoption of LOS D <br /> r as an acceptable standard. Adopting LOS C standards for street design can lead to unusually <br /> ' wide streets,high speeds, and dangers to pedestrians and bicyclists. For example, in the case <br /> of Byron Road east of Grant Line Road, a four-lane roadway would suffice for LOS D <br /> P whereas LOS C would require a six-lane roadway. <br /> F1 4-74 <br />
The URL can be used to link to this page
Your browser does not support the video tag.