Laserfiche WebLink
nm <br /> m College Park at Mountain House Specific Plan III <br /> 0 <br /> Mitigation Monitoring and Reporting Program <br /> o Implementation&Verification <br /> 0 Implementation <br /> o' Mitigation Measure Timing/Schedule Responsibility Action Date <br /> Completed <br /> c4.6-3 Cultural Resources—Potential to Uncover Human During construction SJCCDD,in <br /> 0. Remains conjunction with the <br /> CDIn accordance with the California Health and Safety developer,and in <br /> Code, if human remains are uncovered during conjunction with <br /> c construction at the project site, the College Park qualified archaeologist <br /> developer or construction contractor shall immediately and County Coroner, <br /> halt potentially damaging excavation and notify if needed. <br /> 3 SJCCDD.The County shall, in tum, immediately <br /> notify the San Joaquin County coroner of the find.The <br /> coroner is required to examine all discoveries of <br /> human remains within 48 hours of receiving notice of <br /> a discovery on private or state lands(HSC Section <br /> o, 7050.5[b]). If the coroner determines that the remains <br /> are those of a Native American,he or she shall contact <br /> the Native American Heritage Commission(NAHC) <br /> by phone within 24 hours of making that <br /> o determination(HSC Section 7050[c]).Once a Most <br /> Likely Descendent(MLD)has been designated by the <br /> m NAHC,the MLD, in consultation with the County, <br /> 9 shall determine the ultimate disposition of the remains. <br /> RL The responsibilities of the County for acting upon <br /> °= notification of a discovery of Native American human <br /> o remains are outlined in detail in the PRC Section <br /> 5097.9.Measures likely resulting from the above <br /> �• could include preservation in place and <br /> x capping/avoidance,or removal and continued <br /> Nmonitoring ofground-disturbing activities. <br /> co <br /> o` 0 4.7 DRAINAGE <br /> s 4.7-2 Drainage—Result in Flooding or Exceed the Before construction MHCSD, in <br /> 5 0 Capacity of the Storm-drain System conjunction with the <br /> 0 _10 The College Park developers shall expand WQB1 as developer <br /> required to accommodate runoff from the College <br /> Park project,or shall provide the required on-site <br />