Laserfiche WebLink
gm <br /> o <br /> � College Park at Mountain House Specific Plan III <br /> S Mitigation Monitoring and Reporting Program <br /> o Implementation 8 Verification <br /> o Implementation <br /> o Mitigation Measure Timing/Schedule Responsibility Action Date <br /> Completed <br /> omaintenance responsibilities; <br /> 70 < Specify the pollutants that are likely to be used <br /> during construction that could be present in <br /> P. stormwater drainage and non-stormwater <br /> co discharges; <br /> -a < Specify BMP inspection protocols to ensure that <br /> E3 <br /> the BMPs are effective and ensure that the <br /> 3 monitoring is conducted if nonvisible pollutants <br /> are inadvertently discharged into stormwater. <br /> < Identify construction techniques that will reduce <br /> the potential for runoff; <br /> < Identify the erosion and sedimentation control <br /> m measures to be implemented; <br /> < Specify spill prevention and contingency <br /> measures; <br /> < Identify the types of materials used for <br /> o_ equipment operation; <br /> < Identify measures to prevent or clean up spills of <br /> CD hazardous materials used for equipment <br /> 0 operation and hazardous waste; <br /> K < Identify emergency procedures for responding to <br /> spills; <br /> < Identify BMPs that shall be used in all <br /> v subsequent site-development activities; <br /> < Identify personnel training requirements and <br /> C/) c procedures that will be used to ensure that <br /> workers are aware of permit requirements and <br /> o Cn proper installation and performance inspection <br /> 0 methods for specified BMPs; <br /> S' n < Identify the appropriate personnel responsible for <br /> csupervisory duties related to implementation of <br /> m <br /> > > the SWPPP; and <br /> - < Require all construction contractors to retain a <br /> I I I I I L l l l <br />