Laserfiche WebLink
M <br /> v <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> o Implementation&Verification <br /> o' Mitigation Measure Timing/Schedule Implementation <br /> j Responsibility Action Completed <br /> co <br /> n <br /> requirements from the County Environmental <br /> � Health Department.Dairy waste ponds or any <br /> other sources of contamination shall be removed <br /> a under a qualified hazardous materials expert in <br /> accordance with applicable regulations and <br /> requirements from the Central Valley RWQCB or <br /> 23 <br /> the California Department of Toxic Substances. <br /> This includes the December 4,2003 crude oil <br /> releases and any migration of it to the project site. <br /> The soil underlying these facilities shall be <br /> sampled and tested by the expects. If the testing <br /> reveals contamination, the regulatory agencies <br /> o shall be contacted,any recommendations by the <br /> experts shall be implemented, and regulating <br /> agency shall identify"no further action"before <br /> project construction. <br /> o < Other potential existing sources of contamination <br /> (i.e.,septic systems,refuse piles, waste ponds, <br /> CD electrical transformers containing PCBs)on the <br /> m project site and off-site infrastructure sites shall be <br /> identified and removed under the supervision of <br /> qualified hazardous materials experts and in <br /> o accordance with applicable regulations before <br /> construction.The applicant shall demonstrate to <br /> W. the County Environmental Health Department that <br /> x the above has taken place before issuance of <br /> m building permits. If the experts observe potential <br /> soil contamination or noxious odors associated <br /> a $ with these facilities,the soils underlying these <br /> c, ; facilities shall be sampled and tested by the <br /> experts. If the testing reveals contamination,the <br /> 0 regulatory agencies shall be contacted, any <br /> recommendations made by the experts shall be <br /> implemented,and the County Environmental <br /> I I I I I I I I I I I I I I I I I I <br />