Laserfiche WebLink
Km <br /> a <br /> D <br /> o College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> 6 Mitigation Measure Timing/Schedule <br /> 2. Implementation <br /> Implementation &Verification <br /> �. Date <br /> Responsibility Action Completed <br /> nduring the nesting season(February 15–August <br /> ;U 31),pre-construction surveys shall be conducted <br /> fD during the nesting season in suitable nesting <br /> habitat within 500 feet of areas of project <br /> activity. The survey shall be conducted within <br /> the 2 weeks before construction or tree removal <br /> begins.If any active nests are found,a setback of <br /> 3 200 feet from each nest shall be established and <br /> maintained during the nesting season for the <br /> period encompassing nest building and <br /> continuing until fledglings leave nests.This <br /> setback applies whenever construction or other <br /> No ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that <br /> are known to be occupied. Setbacks shall be <br /> marked by brightly colored temporary fencing. <br /> 0 4.10-7 Biological Resources—Conversion of Other Before construction SJCOG, in <br /> ID <br /> Special-Status Nesting Bird Habitat and Possible (surveys shall be consultation with DFG <br /> `D Loss of Active Nests conducted 2 weeks <br /> The College Park developers shall request coverage prior to construction <br /> m under the SJMSCP,and fees shall be paid in the activities) <br /> amount determined by SJCOG during the application <br /> and review process for each project under College <br /> Park.During the SJMSCP application process, <br /> SJCOG will determine whether that specific project <br /> o site supports suitable habitat for loggerhead shrike, <br /> CS California homed lark, or tricolored blackbird. If <br /> 0Cl) determines SJCOG deteines suitable habitat is present on or <br /> 2 m adjacent to a given project site, the following <br /> SJMSCP incidental take avoidance and minimization <br /> n measures shall be implemented by the project <br /> > applicants in consultation with a qualified biologist. <br /> < Loggerhead Shrike.If project construction <br /> I I I I I I I I I I I I I i I I I I I <br />