Laserfiche WebLink
I r r-- r— r <br /> W0 <br /> Wo <br /> CD <br /> O <br /> w m College Park at Mountain.House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> m Implementation&Verification <br /> Implementation <br /> o Mitigation Measure Timing/Schedule Responsibility Action Date <br /> Completed <br /> T. for Protection of the San Joaquin Kit Fox before <br /> x or during Ground Disturbance(US Fish and <br /> Wildlife Service[FWS] 1999b)shall apply <br /> (except that pre-construction survey protocols <br /> shall remain as established in the above <br /> paragraph).These standards include provisions fo <br /> educating construction workers regarding the kit <br /> fox,keeping heavy equipment operating at safe <br /> speeds,checking construction pipes for kit fox <br /> occupation during construction,and similar low- <br /> or no-cost activities. <br /> 4,10-10 Biological Resources—Loss or Alteration of Before construction SJCOG,in <br /> w Jurisdictional Waters of the United States coordination with <br /> Impacts to waters of the United States are not currently DFG,USACE and/or <br /> rrtigated by participation in the SJMSCP.Therefore, RWQCB <br /> the College Park developers shall implement the <br /> following measures: <br /> < Before implementation of any Tentative Map or <br /> development project(if no Tentative Map)under <br /> bthe College Park project,a formal Section 404 <br /> delineation of waters of the United States, <br /> 0 including wetlands, shall be conducted by a <br /> o' qualified biologist in the Tentative Map or <br /> development project area if the area includes <br /> m features that are potentially subject to United <br /> n States Army Corp of Engineers(USACE) <br /> jurisdiction(ponds, irrigation canals,and <br /> $ drainages).The delineation shall be submitted to <br /> USACE for verification. <br /> aa <br /> < If,based on the verified delineation, it is <br /> rno determined that fill of waters of the United States <br /> 3 would result from the Tentative Map or <br /> development project,authorization for such fill <br />