Laserfiche WebLink
� m <br /> 0 <br /> v College Park at Mountain House Specific Plan III <br /> °= Mitigation Monitoring and Reporting Program <br /> oImplementation&Verification <br /> o Mitigaton Measure TiminglSchedule Implementation <br /> �. Responsibility Action CompPleted <br /> c ► Before project activity,USFWS shall be consultation with <br /> A consulted to determine whether widening of USFWS <br /> `D Grant Line Road has potential to adversely affect <br /> ; California red-legged frog. It may be necessary <br /> to conduct a formal habitat assessment and <br /> v surveys to make such a determination.If it is <br /> cc <br /> determined that adverse effects are unlikely to <br /> 3 occur,no further mitigation shall be required. <br /> < If it is determined that adverse effects to <br /> California red-legged frog could occur, <br /> consultation with USFWS shall be conducted, and <br /> authorization for incidental take could be required. <br /> Specific mitigation measures would be developed <br /> during the consultation process.Measures <br /> designed to avoid and minimize take to the <br /> greatest extent feasible shall be developed and <br /> o implemented.These may include limiting . <br /> m activities to certain seasons,minimizing <br /> CD vegetation removal and in-water construction <br /> activities, conducting pre-construction surveys, <br /> and conducting daily surveys and monitoring of <br /> construction areas. If necessary, appropriate <br /> a ro riate <br /> ocompensation for loss of habitat and other adverse <br /> 3 effects would also be developed.This could <br /> include measures such as enhancement of existing <br /> = habitat and creation of additional habitat.. <br /> rn c <br /> Swainson's Hawk Before construction SJCOG, in <br /> o` cn < If project construction begins during the (surveys shall be consultation with DFG <br /> Swainson's Hawk nesting season,as defined by conducted 2 weeks <br /> DFG(March 1 to September 15),pre-construction prior to construction <br /> n -0 surveys shall be conducted in areas of suitable activities) <br /> > nesting habitat within 0.5 mile of project activity. <br /> ' = Surveys shall be conducted by a qualified <br /> I I I I I I I I I I I I I I I I I I I <br />