Laserfiche WebLink
Km <br /> � 0 <br /> C3 College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> j Implementation&Verification <br /> g Mitigation Measure Timing/ScheduleImplementation Date <br /> Responsibility Action <br /> Completed <br /> 0 4.134 Noise--Compatibility of Proposed Land Uses After construction SJCCDD, in <br /> exceeding Predicted Noise Levels conjunction with the <br /> `D The College Park developers shall implement the developer;in <br /> following measures: consultation with a <br /> co' < Traffic Noise—Arterials.Before occupancy of qualified acoustical <br /> othe first residence proposed under the College consultant <br /> Park project along each of the seven arterial <br /> segments identified in Table 4.13-11 of the EIR, <br /> a sound barrier shall be constructed by the <br /> College Park developers along that arterial <br /> segment.The noise barrier may consist of a wall, <br /> berm,or combination thereof. The exact location, <br /> height and character of the sound barrier shall be <br /> determined by a noise consultant approved by the <br /> County. The sound barrier shall reduce outdoor <br /> noise levels at the center of backyards of <br /> o proposed adjacent single-family residences to <br /> below 65 dBA L&/CNEL and as close to 60 dBA <br /> m L&/CNEL as feasible.This mitigation shall be <br /> funded through fair-share payments by the <br /> R' College Park developers. <br /> d <br /> 0 <br /> c <br /> 0 <br /> m <br /> 2 <br /> d N <br /> � (D <br /> N <br /> d <br /> a � <br /> c, <br /> � n <br /> 0 -0 <br /> O y <br /> I I I I I I I I I I I I I I I I I I I <br />