Laserfiche WebLink
F_ r r I IF e r I r—. r— r_ r r r_ r-- r— r— r— r— r-- <br /> W0 <br /> Wa <br /> d College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> o d Implementation Implementation&Verification <br /> c Mitigation Measure Timing/Schedule <br /> = Date <br /> Completed <br /> �• 4.14-2 Visual Quality—Alteration of a Scenic Vista from During and after MHCSD <br /> = Mountain House Parkway construction <br /> NThe following measures shall be implemented by the <br /> College Park developers: <br /> Cn <br /> < If the landscaping and edge treatments required <br /> by the MHMP and MHCSD Design Manual have <br /> not been developed on the east side of Mountain <br /> House Parkway fronting the Pombo property by <br /> Specific Plans I or II at the time the proposed <br /> pond is developed on the Pombo property, the <br /> required landscaping and edge treatments on the <br /> east side of Mountain House Parkway in the <br /> vicinity of the proposed pond shall be installed <br /> by the College Park developers.This shall be <br /> done concurrent with development of the pond. <br /> If the aboveground pond option is developed,the <br /> west-facing pond berm shall be densely landscaped <br /> by the College Park developers. In addition,the berm <br /> shall be constructed by the College Park developers <br /> o. using contoured and rounded slopes to avoid angular <br /> = face slopes. This shall be done concurrent with <br /> o development of the pond. <br /> _ <br /> 0 <br /> d <br /> _ <br /> n <br /> m <br /> _ <br /> rn <br /> M <br /> 3 <br />