Laserfiche WebLink
MOUNTAIN HOUSE PROPOSED ALTAMONT HEIGNTS TENTATIVE MAP 4. ENVEtoNMENTAL CHECKLIST <br /> 4.9 LAND USE AND PLANNING <br /> L <br /> Less Than <br /> Potential SPIHEIR Significant <br /> Significant Requires Impact Due New New <br /> Impact Additional to Mitigation Additional Additional <br /> Less Than Adequately Review:No Measures in Impact Not Mitigation <br /> Significant Addressed in Significant Project Addressed in Measures <br /> L Issue or No Impact SPIIIEIR Impact Description SPIREIR Required <br /> 9. LAND USE AND PLANNING. <br /> L Would the project: <br /> a) Physically divide an established . ❑ ❑ ❑ ❑ ❑ <br /> community? <br /> b) Conflict with any applicable land ❑ ■ El ❑ ❑ El <br /> plan,policy,or regulation of an <br /> agency with jurisdiction over the <br /> project(including,but not limited to <br /> the general plan,specific plan,local <br /> ` coastal program,or zoning <br /> ordinance)adopted for the purpose <br /> of avoiding or mitigating an <br /> environmental effect? <br /> c) Conflict with any applicable habitat <br /> conservation plan or natural • ❑ ❑ ❑ ❑ ❑ <br /> community conservation plan? <br /> L <br /> SETTING <br /> RIM The site of the proposed Altamont Heights project is near the western boundary of the <br /> Mountain House Community and south of the existing Grant Line Village residences. The <br /> site has been used for dry farming in the past. The project site is currently surrounded by <br /> mostly vacant land either under agriculture production or laying fallow. Figure 4.9-1 shows <br /> ` land uses directly north/northwest of the project site. <br /> 6. <br /> Figure 4.9-1. Views of Grant Line Village homesites. <br /> ` Since implementation of the Mountain House Master Plan (MHMP) in 1994,development <br /> has been occurring in the central portion of the Mountain House Community. Neighborhood <br /> F has been built out and Neighborhoods E and G are partially occupied while construction of <br /> ` these neighborhoods continues as evident in the aerial photo in Figure 2-1. Plans have been <br /> approved for the Mountain House Business Park located in the southeast corner of the <br /> Mountain House Community. <br /> 448 <br />