My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006256
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
20058
>
2600 - Land Use Program
>
PA-0600433
>
SU0006256
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2019 1:55:06 PM
Creation date
9/5/2019 10:47:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006256
PE
2620
FACILITY_NAME
PA-0600433
STREET_NUMBER
20058
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
MOUNTAIN HOUSE
APN
20907026
ENTERED_DATE
9/15/2006 12:00:00 AM
SITE_LOCATION
20058 W GRANT LINE RD
RECEIVED_DATE
9/12/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\20058\PA-0600433\SU0006256\CDD OK.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1073
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I. All in-tract landscaping and utility RNV areas and all other landscape areas within. <br /> Specific Plan III that were'not in the original.Master Plan,the MHCSD Parks,Recreation <br /> and Leisure Plan,ttie TlF or,the CFF {,lanuary,'24a3)as determined.by MHCSD,will <br /> require'a-funding mechanism as determined by.MHCSD. These areas wilt require <br /> establishment of a maintenance'entityorfinancing m6chanisnracceptable to MHCSD to <br /> provide funding for maintenance of, and if necessary;replacement at the end of the <br /> useful life of improvements including,-but not limited fo landscapifig, pathways,walls, <br /> and all iimcialpgobenefit of this subdivision .This <br /> subdivision shall be a part of,the financing mechanism (Lighting and Landscape <br /> Maintenance District)to be established for the entire SP 111 Open Space Corriiiar <br /> System'. The financing m'echanWfi 6hail be cor ol4e'd an Opted Ry the Board of <br /> Directors prior to the approval of th`e First Final [clap: <br /> J. A continuous 8-foot wide Landscape Buffer/Easement and Agricultural Fer ce'per <br /> Specific Ptan III Implementation Measures 3.2.3.3(c)and (e)-shalt be`provided. All <br /> Improvements shall be consistent with all Community Approvals including applicable <br /> provisions of the,MHCSD Design Manual and Standards. <br /> ' r <br /> K. Continuous Wall and Agricultural Fence Maintenance Access Easements shall be <br /> provided as required by the MHCSD. r <br /> 33. AIB Neighborhood Parks: <br /> A. The neighborhood parks identified within Specific Plan III shall be dedicated to MHCSDT <br /> or an offer of dedication to the MHCSD shall-be recorded withthe First Final Map. <br /> Timing: condition shall be met with approval of f=irst Final Map of Neighborhood AIB. <br /> B. The Neighborhood AIB Parks shall be designed consistent with all Community. . <br /> Approvals,including applicable provisions of the Parks, Recreation and Leisure Plan and <br /> the MHCSD Design Manual. The design of the parks shall be reviewed and approved <br /> by MHCSD. Timing: condition shall be met prior to approval of First Final Map. <br /> C. The MHCSD General Manager may allow the Neighborhood Parks to be constructed in <br /> phases to be consistent with usage demand and other public interest considerations. <br /> Construction of the first phase of the neighborhood park shall begin no tater than the _. <br /> time at which 50%of the dwelling units for Neighborhood AIB (separate from <br /> Neighborhood D)or school attendance area, whichever is sooner,have been issued a <br /> building permit. The Park shall be completed no later than the time at which 80% of <br /> dwelling units for the neighborhood have been issued building permits. Completion time <br /> may be modified by the MHCSD General Manager to reflect construction,weather, <br /> budget, or other public interest contingencies. <br /> D. A formal agreement for joint use of parks and recreation facilities with adjacent K-S <br /> schools shall be required prior to construction of the park. (Implementation Measure <br /> 72.2.3d) 1 <br /> E. The AIB Neighborhood 2.5 acre Park shall be constructed or bonded for at the discretion <br /> of the MHCSD at the time 50%of the dwelling unit permits for this subdivision have had <br /> their Final inspection. Completion time may be modified by the MHCSD General � . <br /> Manager to reflect construction, weather, budget, or other public interest contingencies <br /> 34. South Community Park: f <br /> A. Community Park land identified within Specific Pian III shall be dedicated to MHCSD on <br /> a minimum of a pro rata basis, as.determined by MHCSD,with the applicant to pay fair <br /> share of all park improvements_ Timing: prior to issuance of first building permit. <br /> l 26 <br /> i ' <br /> } <br />
The URL can be used to link to this page
Your browser does not support the video tag.