Laserfiche WebLink
i <br /> MIT' <br /> GATTON MONITORING AND REPORTING PROGRAM <br /> INTRODUCTION <br /> In accordance with the C C.l riiia Ert'�onttitntal Quality.Act(CEQA);San Joaquin County.(coun(y)and <br /> Gerry N. Kamtlos, LLC(GNK,LLC},;prepared ail.environmerital.impactreport(EIIt)that identifies <br /> aclvertse impacts related to the Cal#ege Park at IVtquntatn House. peei#ie Plan Ill Project,The Ell also <br /> identifies titttTation measures-that would reduce or,,liaiiinate these impacts. <br /> Section 21081:6 of the.Cal fomia Public Rcsources Code§15091(d}and 15097 of the State C1;QA <br /> Guidelines require public agencies"fo adopt&reporting add monitorin <br /> g program for changes to the- <br /> project which it has adopted 6r'made a condition of project approval in order to.mitigate or avoid <br /> significant effects on the environment:"A Mitigation Monitoring and Reporting Program(MMRP) is <br /> required for the College Park at,Mountain <br /> .House Specific Plan III Project because the EIR.for the project <br /> identifiedpotentially significant adverse impacts related <br /> and to construction and implementation activities, <br /> mitigation measures have been identified to mitigate those impacts. <br /> i <br /> j Adoption of the MMRP will occur along with approval of the proposed project. <br /> i PURPOSE OF MITIGATION MONITORING AND REPORTING PROGRAM <br /> This MMRP has been prepared to ensure that all required mitigation measures are implemented and <br /> completed according to schedule and maintained in a satisfactory manner during the construction of the <br /> project,as required.The MMRP may be modified by San Joaquin County during project implementation, <br /> as necessary, in response to changing conditions or other refinements. A table has been prepared to assist <br /> the responsible parties in implementing the MMRP.The table identifies individual mitigation measures, <br /> monitoring/mitigation timing,responsible person/agency for implementing the measure, monitoring and <br /> reporting procedure, and space to confirm implementation of the mitigation measures.The numbering of <br /> mitigation.measures follows the numbering sequence found in the EIR. <br /> ROLES AND RESPONSIBILITIES <br /> Unless otherwise specified herein, San Joaquin County is responsible for taking all actions necessary to <br /> implement the mitigation measures according to the specifications provided for each measure and for <br /> demonstrating that the action has been successfully completed. San Joaquin County,at its discretion, may <br /> delegate implementation responsibility or portions thereof to the developer(GNK, LLC), a licensed <br /> contractor or other designated agent. <br /> San Joaquin County will be responsible for overall administration of the MMRP and for verifying that <br /> County staff members, and/or the construction contractor has completed the necessary actions for each <br /> measure. San Joaquin County will designate a project manager to oversee the MMRP during the <br /> construction period. Duties of the project manager include the following: <br /> < Ensure that routine inspections of the construction site are conducted by appropriate San Joaquin <br /> County staff; check plans,reports, and other documents required by the MMRP; and conduct report <br /> activities. <br /> < Serve as a liaison between San Joaquin County, the Mountain House Community Services District <br /> (MHCSD), and the construction contractor regarding mitigation monitoring issues. <br /> < Complete forms and maintain reports and other records and documents generated by the MMRP- <br /> College hark at Mountain House Specific plan ill <br /> San Joaquin County EDAW <br /> 1 Mitigation Monitoring and Reporting Program <br />