Laserfiche WebLink
Cn n <br /> CD <br /> (D College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> o Mitigation Measure TimirsglSctledule <br /> Implementation Implementation$�Vetifcation <br /> Responsibility Action Date <br /> Completed <br /> 4.2 LAND USE <br /> 0 4.2-1 Land Use and Agriculture--Conflict with Existing Before and during San Joaquin County <br /> Land Uses construction;and Community <br /> 0 The College Park developers shaII implement the During design phase Development <br /> fo]Iowing measures: Department <br /> < Fence off the two on-site Byron-Bethany (SJCCDD),in <br /> 77 Irrigation District(BBID)canals from proposed conjunction with the <br /> urban development until such time as the canals developer,and in <br /> are filled. The fencing shall be sufficient.to block coordination with <br /> access to the canals by all except BBID - BBID <br /> personnel and other authorized persons, and shall <br /> be developed in coordination with BBID to <br /> ensure that BBID has continued access to the <br /> canals for maintenance activities. <br /> < Implement Mitigation Measure 4.9-5,identified <br /> in Section 4,9,"Public Health and Safety,"to <br /> ensure that the proposed residences are not <br /> exposed to an explosion hazard from the natural <br /> v gas pipelines within the PG&F Chevron - - <br /> easement that bisects the project site. <br /> < Identify an agricultural buffer of no less than 100 <br /> feet at the time of Tentative Map approval for <br /> a any new units in the residential area in and south <br /> ' of Grant Line Village and adjacent to the County <br /> m line. <br /> CLC <br /> �n <br /> o m <br /> cp p <br />