Laserfiche WebLink
to n <br /> a� o <br /> o <br /> `CD College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> n implementation Implementation&Verification. <br /> c Mitigation Measure Timing/Schedule <br /> c Responsibility Action Date <br /> � <br /> qualified biologist and DFG determine it would Completed <br /> qg� <br /> o not be likely to adversely affect the nest. <br /> Monitoring of the nest by a qualified biologist <br /> CD may be required if the activity has potential <br /> C/) <br /> adversely affect the nest. <br /> San Joaquin Kit Fox Before construction S7COG, in <br /> < To minimize the potential for destruction of an {surveys to be consultation with <br /> occupied burrow and direct take of a kit fox, a completed no more USFWS and DFG' <br /> pre-construction survey for active and potential kit than 30 days and no <br /> fox dens shall be conducted by a qualified less than. 14 days <br /> biologist no more than 30 days and no less than 14 before construction <br /> days before the beginning of ground disturbance activities) <br /> or construction activity. The survey shall include <br /> all undeveloped areas in and within 100 feet of <br /> development and staging areas.Potential dens <br /> shall be monitored to determine if they are active, <br /> in accordance with methods presented in the <br /> Standardized Recommendations for Protection of <br /> the San Joaquin Kit Fox Before or During Groun <br /> Disturbance(USFWS 2999), <br /> < If no active dens are found during the surveys,a <br /> o letter report documenting the survey methodology <br /> p' and findings shall be submitted to USFWS and <br /> Cn' DFG within 5 days after survey completion and <br /> v before the start of ground disturbance or <br /> a construction activity,and no further mitigation <br /> shall be necessary. <br /> 0 < Any known or potential dens discovered within <br /> the survey area shall be monitored for 3 days to <br /> determine its current use.If no activity is observe <br /> co Q during this period, the den shall be destroyed <br /> immediately to preclude subsequent use. If kit fox <br /> activity is observed, the den shall be monitored fori <br />