Laserfiche WebLink
M <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> a Mitigation Measure Timing/Schedule Implementation <br /> tmpleme.ntationA Verifcation <br /> te <br /> Responsibility, Action. <br /> Completed <br /> 4.13.4 Noise—Compatibility of Proposed Land Uses After construction S]CCDD,in <br /> CL <br /> exceeding Predicted Noise Levels conjunction with the. <br /> CD The College Park developers shall implement the developer;in . <br /> following measures: consultation with a <br /> co < Traffic Noise—Arterials.Before occupancy of qualified acoustical <br /> the first residence proposed under the College consultant <br /> Park project along each of the seven arterial <br /> segments identified in Table 4.13-11 of the EIR, <br /> a sound barrier shall be constructed by the <br /> College Park developers along that arterial <br /> segment,The noise barrier may consist of a wall, <br /> berm, or combination thereof.The exact location, <br /> height and character of the sound barrier shall be <br /> determined by a noise consultant approved by the <br /> County,The sound barrier shall reduce outdoor <br /> noise levels at the center of backyards of <br /> o proposed adjacent single-family residences to <br /> below 65 dBA L�/CNEL and as close to 64 dBA <br /> L&/CNEL as feasible.This mitigation shall be <br /> funded through fair-share payments by the <br /> College Park developers. <br /> v ' <br /> C <br /> c <br /> v <br /> Cn c <br /> � ro <br /> CO <br /> o z, <br /> a n . <br /> o fl, <br /> c � <br /> a _ <br /> rwpm� "won" I�M�1� "Mo.% WIPM !�Fw� <br />