Laserfiche WebLink
Ami q <br /> CD <br /> v CD College Paris at Mountain House Specific Plan III <br /> v Mitigation Monitoring and Reporting Program <br /> Implementation <br /> implementation&Verification <br /> c° Mitigation Measure Timing/Schedule <br /> C Responsibility Action Date <br /> 31 1 Completed <br /> 4,14-2 Visual Quality Alteration of a Scenic Vista from During and after MHCSD <br /> z Mountain House Parkway construction <br /> cThe following measures shall be implemented by the <br /> College Park developers: <br /> < If the landscaping and edge treatments required <br /> by the MHMP and MHCSD Design Manual have <br /> "a not been developed on the east side of Mountain <br /> House Parkway fronting the Pombo property by <br /> Specific Plans I or 11 at the time the proposed <br /> pond is developed on the Pombo property,the <br /> required landscaping and edge treatments on the <br /> east side of Mountain House Parkway in the <br /> vicinity of the proposed pond shall be installed <br /> by the College Park developers.This shall be <br /> done concurrent with development of the pond. <br /> If the aboveground pond option is.developed,the <br /> west-facing pond bean shall be densely landscaped <br /> by the College Park developers.In addition,the berm <br /> shall be constructed by the College Park developers <br /> °= using contoured and rounded slopes to avoid angular <br /> a face slopes.This shall be done concurrent with <br /> o development of the pond. <br /> o <br /> m <br /> a <br /> 5' <br /> �a <br /> o m <br /> cQ p <br /> 3 � <br />