My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006256
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
20058
>
2600 - Land Use Program
>
PA-0600433
>
SU0006256
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2019 1:55:06 PM
Creation date
9/5/2019 10:47:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006256
PE
2620
FACILITY_NAME
PA-0600433
STREET_NUMBER
20058
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
MOUNTAIN HOUSE
APN
20907026
ENTERED_DATE
9/15/2006 12:00:00 AM
SITE_LOCATION
20058 W GRANT LINE RD
RECEIVED_DATE
9/12/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\20058\PA-0600433\SU0006256\CDD OK.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1073
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CD <br /> College Park at Mountain House Specific PIan III <br /> CD <br /> W Mitigation Monitoring and Reporting Program <br /> !m lementadon&Verification <br /> Mitigation.Measure nminglSchedule Implementation p bate <br /> o Responsibility Action <br /> -{ Completed <br /> Health Department shall identify"no further . <br /> o actions required"before project construction <br /> y access at these locations. <br /> cD < Phase I Environmental Site Assessment(ESAs) <br /> Cn <br /> shall be prepared by qualified hazardous materials <br /> —�� experts for areas in Grant Line Village that are the <br /> subject of future development proposals before <br /> construction in these areas.The ESAs shall be <br /> reviewed and approved by the County <br /> Environmental Health Department.Any <br /> recommendations made in the ESAs(monitoring, <br /> Phase II testing,mitigation,etc.)shall be <br /> implemented. <br /> < Project grading,excavation,and other earth- <br /> moving activities directly adjacent to the off-site <br /> parcel where the December 4,2003 crude oil <br /> release took place shall not occur until it has been <br /> verified, either by the assessment currently being <br /> conducted by the RWQCB or separate soil and <br /> =' groundwater sampling commissioned by the <br /> o' <br /> College Park developers, that the contamination <br /> o <br /> associated with the incident has not migrated to <br /> the College Park site.If the contamination has <br /> migrated to the College Park site,it shall be fully <br /> remediated to the satisfaction of the County <br /> m <br /> a Environmental Health Department before project <br /> construction activities in the contaminated area. <br /> (D <br /> < Project construction activities at hazardous <br /> materials sites#3 and 7(identified in Figure 4.9-2 <br /> and Table 4.9-1 of the EIR)shall occur only after <br /> an contamination that may exist at these sites has <br /> rn� Y Y . <br /> been fully remediated to the satisfaction of the <br /> County Environmental Health Department,the <br /> status of the sites has been changed to"no further <br />
The URL can be used to link to this page
Your browser does not support the video tag.