Laserfiche WebLink
v o <br /> rnCollege Park at Mountain House Specific Plan III <br /> Mitigation Monitoring.and Reporting Program <br /> v Implementation i£Verification <br /> o Implementation <br /> c Mitigation Measure TiminglSchedule Date <br /> o Responsibility Action <br /> Completed <br /> employing one of several methods outlined in <br /> = Section 5.2.4.15 of the SJMSCP.These include <br /> CO retention of tall vegetation,,regular discing of the <br /> CD site, or use of chemicals or traps to kill ground <br /> squirrels; <br /> ► Pre-construction surveys for burrowing owls <br /> shall be conducted where project construction <br /> activities would occur within 75 meters of <br /> suitable habitat(based on SJCOG review).The <br /> survey shall be conducted within 2 weeks of the <br /> beginning of construction.If burrowing owls are <br /> found,the following measures shall be <br /> implemented: <br /> • During the nonbreeding season(September 1 <br /> through January 3 1),burrowing owls <br /> occupying the project site shall be evicted <br /> from the project site by passive relocation,as <br /> described in the DFG's Staf•Report on <br /> Burrowing Owls(DFG 1995). <br /> o During the breeding season(February i <br /> through August 31),occupied burrows shall <br /> 0 not be disturbed and shall be provided with a <br /> 6 250-foot protective buffer until and unless <br /> 5' the Technical Advisory Committee,with the <br /> w concurrence of the permitting agencies' <br /> representatives on the Technical Advisory <br /> Committee,or a qualified biologist approved <br /> -$ by the permitting agencies,verifies through <br /> noninvasive means that either(1)the birds <br /> `Q have not begun egg laying or(2)juveniies <br /> M from the occupied burrows are foraging <br /> > independently and are capable of <br /> independent survival.Amer the fledglings <br />