Laserfiche WebLink
cfl <br /> a—' College Park at Mountain House Specific.Plan III <br /> Mitigation Monitoring and Reporting Program <br /> o Implementation&Verification <br /> o Mitigation Measure Timing/Schedule Implementation Date <br /> Responsibility Action <br /> Completed <br /> ► Before project activity,USFWS shall be consultation with <br /> ;0 consulted to determine whether widening of USFWS <br /> rn Grant Line Road haspotential to adversely affect <br /> California red-legged frog.It may be necessary <br /> cc to conduct a formal habitat assessment and <br /> osurveys to make such a determination.If it is <br /> determined that adverse effects are unlikely to <br /> occur,no further mitigation shall be required. <br /> < If it is determined that adverse effects to <br /> California red-legged frog could occur, <br /> consultation with USFWS shall be conducted,and <br /> authorization for incidental take could be required. <br /> Specific mitigation measures would be developed <br /> during the consultation process.Measures <br /> designed to avoid and minimize take to the <br /> greatest extent feasible shall be developed and <br /> o implemented.'These may include limiting <br /> io activities to certain seasons,minimizing <br /> CD vegetation removal and in-water construction <br /> activities, conducting pre-construction surveys, <br /> and conducting daily.surveys and monitoring of <br /> construction areas.If necessary,appropriate <br /> ocompensation for loss of habitat and other adverse <br /> effects would also be developed.This could <br /> include measures such as enhancement of existing <br /> o habitat and creation of additional habitat. <br /> N Swainson's Hawk Before construction SJCOG,in' <br /> CD <br /> C_ cr, < If project construction begins during the (surveys shall be consultation with DFG <br /> Swainson's Hawk nesting season,as defined by conducted 2 weeks <br /> DFG(March I to September 15);pre-construction prior to construction <br /> o -0surveys shall be conducted in areas of suitable activities) <br /> nesting habitat within 4.5 mile of project activity. <br /> Surveys shall be conducted by a qualified <br />