Laserfiche WebLink
++.�r� �.�. �..ti 1v�mrw .-.�� .,i�..r,- _.�.. �, �—�9 t'�'! Y-�"ry 'f"�rl J� ?�y ��"•+w`i �-'e-"� ;'��`F'1. .+""""`I <br /> i�_�.l �� �-..--..� a,-�...� �..r l r—�„I :.�.r•3 r--.� t„�.�,J 'rr��! �,r.1 �.r.1 ��-1 ,e„r,7 �.-I w•++r.r 1,�„�� .-rr µ_—,., <br /> C!I C7 <br /> N Q <br /> College Park at Mountain House Specific Pian III <br /> Mitigation Monitoring and Reporting Program <br /> oImplementation Implementation&1/erifcation <br /> o Mitigation Measure Timing/Schedule Responsibility Action Date <br /> .� Completed <br /> qualified biologist and DFG determine it would <br /> not be likely to adversely affect the nest. <br /> NMonitoring of the nest by a qualified biologist <br /> CD may be required if the activity has potential <br /> Cn <br /> adversely affect the nest. <br /> San Joaquin Kit Fox Before construction SJCOG,in <br /> < To minimize the potential for destruction of an (surveys to be consultation with <br /> occupied burrow and direct take of a kit fox,a completed no more USFWS and DFG <br /> pre-construction survey for active and potential kit than 30 days and no <br /> fox dens shall be conducted by a qualified . less than 14 days <br /> biologist no more than 30 days and no less than 14 before construction <br /> days before the beginning of ground disturbance activities) <br /> n or construction activity.The survey shall include <br /> all undeveloped areas in and within 100 feet of <br /> development and staging areas,Potential dens <br /> shall be monitored to determine if they are active, <br /> in accordance with methods presented in the <br /> Standardized Recommendations for Protection of <br /> a� <br /> the San Joaquin Kit Fox Before or During Groun <br /> g Disturbance(USFWS 1999). <br /> < If no active dens are found during the surveys,a <br /> oletter report documenting the survey methodology <br /> p' and findings shall be submitted to USFWS and <br /> DFG within 5 days after survey completion and <br /> before the start of ground disturbance or <br /> n construction activity,and no further mitigation <br /> shall be necessary.. <br /> 0 < Any known or potential dens discovered within <br /> the survey area shall be monitored for 3 days to <br /> `Q determine its current use. If no activity is observe <br /> cQ oduring this period,the den shall be destroyed <br /> > immediately to preclude subsequent use. If kit fox <br /> activity is observed,the den shall be monitored for <br />