Laserfiche WebLink
�Zo <br /> cam' A <br /> s College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> o implementation&Verification <br /> o Mitigation Measure Timing/Schedule Implementation <br /> Date <br /> Responsibility Action. Competed <br /> CL <br /> 4.134 Noise--Compatibility of Proposed Land Uses After construction SJCCDD,in <br /> m exceeding Predicted Noise Levels conjunction with the <br /> g The College Park developers shall implement the developer; ' <br /> following measures: consultation with a <br /> < Traffic Noise—Arterials.Before occupancy of qualified acoustical <br /> othe first residence proposed under the College consultant <br /> Park project along each of the seven arterial <br /> segments identified in Table 4.13-11 of the E1R, <br /> a sound barrier shall be constructed by the <br /> College Park developers along that arterial <br /> segment.The noise barrier may consist of a wall, <br /> berm,or combination thereof. The exact location, <br /> 0 height and character of the sound barrier shall be <br /> determined by a noise consultant approved by the <br /> County.The sound barrier shall reduce outdoor <br /> noise levels at the center of backyards of <br /> o proposed adjacent single-family residences to <br /> below 65 dBA L�/CNEL and as close to 60 dBA <br /> CD L�/CNEL as feasible.This mitigation shall be <br /> funded through fair-share payments by the <br /> m <br /> College Park developers. <br /> Ca <br /> R <br /> z <br /> cn � <br /> � N <br /> CD <br /> 0 <br /> Q7 <br /> � A <br /> � n <br /> C7 � <br /> o � <br /> c � <br /> -c <br />