Laserfiche WebLink
�.-�1 r--�_l 1 ..�-J .y+,l —I ���.J ._J ►. •J t�wJ =7D D =1 <br /> � n <br /> fl7 O <br /> O <br /> o College Park at Mountain House Specific Plan III. <br /> m Mitigation Monitoring and Reporting Program <br /> n Implementation <br /> Implementation&Verification. <br /> C) Mitigation Measure Timing/Schedule Responsibility Action Date <br /> g Completed <br /> W- 4,14-2 Visual Quality—Alteration of a Scenic Vista from During and.after MHCSD <br /> Ir Mountain House Parkway construction <br /> cThe following measures shall be implemented by the <br /> m College Park developers: <br /> < If the landscaping and edge treatments required <br /> 0. by the MHMP and MHCSD Design Manual have <br /> not been developed on the east side of Mountain <br /> a, House Parkway fronting the Pombo property by <br /> Specific Plans I or lI at the time the proposed <br /> pond is developed on the Pombo property,the <br /> required landscaping and edge treatments.on the <br /> east side of Mountain House Parkway in the <br /> vicinity of the proposed pond shall be installed <br /> by the College Park developers. This shall be <br /> done concurrent with development of the pond. <br /> If the aboveground pond option is.developed,the <br /> west-facing pond berm shall be densely landscaped <br /> by the College Park developers.In addition,the berm <br /> shall be constructed by the College Park developers <br /> ousing contoured and rounded slopes to avoid angular <br /> face slopes.This shall be done concurrent with <br /> o development of the pond. <br /> o• <br /> c0 <br /> m <br /> cn <br /> ca <br /> ro <br /> o m <br /> cn � . <br />