Laserfiche WebLink
F; <br /> F 3 <br /> ENVIRONMENTAL DETERMINATION <br />; F <br /> I The Environmental Checklist, consistent with CEQA Guidelines, was used to determine <br /> whether the proposed project is"within the scope"of the SPIIIEIR and to examine the <br /> continued adequacy of the SPIIIEIR. The Checklist and Discussion assess whether (t) there <br /> are any additional significant environmental effects not previously examined in the SPIIIEIR; <br /> and, (2)any new mitigation measures are required(CEQA Guidelines Sections 15168(c), <br /> 2006). <br /> _ 4 <br /> Any one of the following environmental factors would be checked if the proposed project <br /> created a"New Additional Significant Impact Not Addressed in the SPIIIEIR"as indicated <br /> by the Environmental Checklist in Chapter 4. As shown,no such impacts were identified in <br /> the Checklist. <br /> ❑ Aesthetics ❑ Agriculture Resources ❑ Air Quality <br /> ❑ Biological Resources ❑ Cultural Resources ❑ Geology/Soils <br /> ❑ Hazards&Hazardous Materials ❑ Hydrology/Water Quality ❑ Land Use/Planning <br /> ❑ Mineral Resources ❑ Noise ❑ Population/Housing <br /> 333 © public Services ❑ Recreation ❑ Transportation/Traffic <br /> + ❑ Utilities/Service Systems p Mandatory Findings of Significance <br /> � <br /> DETERMINATION: (To be completed by the Lead Agency) <br /> F! <br /> On the basis of this initial evaluation: <br /> 5 I find that the proposed project COULD NOT have a significant effect on the environment, and <br /> a NEGATIVE DECLARATION will be prepared. <br /> F!� ❑ I find that although the proposed project could have a significant effect on the environment, <br /> + there will not be a significant effect in this case because revisions in the project have been made <br /> by or agreed to by the project proponent. A MITIGATED NEGATIVE DECLARATION will <br /> be prepared. <br /> E] I find that the proposed project MAY have a significant effect on the environment,and an <br /> ENVIRONMENTAL IMPACT REPORT is required. <br /> F <br /> F1, i <br /> i <br /> RMOUNTAIN HousE PROPOSED ALTAMONT HEIGm TENTATIVE MAP 3-1 <br />