Laserfiche WebLink
P <br /> R <br /> 'MouNTAIN HOUSE PROPOSED ALTAMONT HEIGHTS TENTATIVE MAP 4. ENVIRONMENTAL CHECKLIST <br /> 4.3 AIR QUALITY <br /> refUse piles are removed. The Altamont Heights project site is over one mile west of the <br /> abandoned dairies at Mountain House Parkway and Grant Line Road. <br /> Development of the proposed project would involve demolition or renovation of existing <br /> buildings that may contain.asbestas_ Therefore, the proposed project could contribute to-the <br /> conditions that make Impact 4.12-2 significant and unavoidable. <br /> k Development of the proposed project would result in increases in long-term,regional <br /> emissions, primarily associated with automobile traffic. Therefore, the proposed project . <br /> would contribute to the conditions that make Impact 4.12-5 significant and unavoidable. i <br /> DISCUSSION REGARDING PROPOSED PROJECT <br /> a) Conflict with or obstruct implementation of the applicable air quality plan? <br /> and <br /> b) Violate any air quality standard or contribute substantially to an existing or projected <br /> air quality violation? <br /> and <br /> c) Result in a cumulatively considerable net increase of any criteria pollutant for which <br /> the project region is non-attainment under an applicable federal or state ambient air <br /> quality standard(including releasing emissions which,exceed quantitative thresholds. <br /> for,ozone precursors)? <br /> #. Development of Specific Plan III, of which the proposed project is a part,would generate <br /> construction, motor vehicle,and other air emissions (from fireplaces,barbecues, etc). The <br /> M:EIR calculated the potential air quality impacts associated with these emissions as part of <br /> the greater MHMP development and concluded that a significant unavoidable impact would <br /> occur (i.e.,conflict with or obstruct implementation of the SJVAPCD Air Quality Attainment <br /> Plan)even with implementation of the mitigation measures identified in the MSIR. <br /> Development of Specific Plan III could potentially conflict with the Air Quality Attainment <br /> Pian,violate air quality standards, contribute substantially to an air quality violation, and/or <br /> result in a cumulatively considerable net increase of criteria pollutants for which the region is <br /> in non-attainment(EDAW, 2005b). <br /> Computer model results presented in the SPIREIR revealed that development of Specific <br /> Plan HI would result in long-term regional emission of approximately 58 tons per year of <br /> reactive organic gas (a precursor to the formation of ozone), 38 tons per year of the oxides of <br /> k nitrogen (principally nitrogen dioxide), and 112 tons per year of PMI0. SJVAPCD's <br /> recommended significance threshold for each of these emissions is 10 tons per year_ <br /> Therefore, development of Specific Plan Ill may contribute to concentrations that exceed <br /> applicable standards because of current non-attainment conditions (EDAW, 2005b). The <br /> resulting impacts would be significant and unavoidable. <br /> i <br /> J <br /> 4-14 <br />