Laserfiche WebLink
Kerry Sullivan s <br /> COMMUNITY DEVELOPMENT <br /> PA-04-38 (SA) <br /> 4. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at <br /> the time of building permit application. (The fee currently is $1877.00 per 1,000 gross square'foot of <br /> building designated as Manufacturing in the Tracy area. The fee shall-be automatically adjusted July I <br /> of each year by the Engineering Construction Cost Index as published by the Engineering News <br /> Record.) (A credit may be allowed if it can be verified that the existing development on this site was in <br /> operation on or before April 23, 1990.) (Resolutions 00-433) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 6. Verification shall be obtained from the Solid Waste Division (468-3066) that this development has met <br /> the requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon <br /> submittal of verification. <br /> NOTE: Any construction activity that results in the disturbance of at least one (1) acre of soil shall <br /> require a State NPDES construction permit. <br /> DTP:DG:ar <br /> PX0MME%7SN5A':YR 2004%PA-0400036.wpd <br /> i; <br /> ii <br /> ij <br /> ms <br /> ii <br /> i. <br /> . _ .. ;. <br />