Laserfiche WebLink
Phase I Site Reconnaissance Checklist <br /> NOA Project Number: E06044A <br /> Page 4 <br /> 17. a. Is there evidence that the subject property discharges waste water, other than storm <br /> water, directly into a ditch or stream adjacent the property? <br /> Yes❑ No <br /> b. Any discharges observed within 200 feet? <br /> Yes ❑ None observed IVI <br /> 18. a. Is there evidence of underground/ above ground storage tanks on the subject <br /> property, including vent pipes, fill pipes, or access ways indicating a fill pipe protruding <br /> from the ground on the subject property? <br /> Yes ❑ No Q <br /> b. Within 200 feet? <br /> Yes❑ None observed <br /> 19. Describe the subject property and its physical, topographic, and vegetative features. <br /> This rectangular shaped parcel is relatively flat used for agricultural purposes. <br /> 20. a. For each structure on the subject property, describe its uses and the location and <br /> type of heating and cooling system. <br /> No structures on the subject property. <br /> b. Are any structures on the subject property observed to contain readily apparent <br /> asbestos-containing materials (ACM)? <br /> Yes ❑ No ❑ No structures on the subject property. <br /> c. Are there any floors, drains, or walls located within the structure which have been <br /> stained with a substance other that water or are emitting foul odors? <br /> Yes ❑ No❑ <br /> No structures on the subject property. <br /> Continuations from above: <br /> ` Site Reconnaissance conducted on: May 4,2006 <br /> By: Tina Chaney&Abigail Racco <br />