My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004963
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GUERNSEY
>
3782
>
2600 - Land Use Program
>
PA-0400524
>
SU0004963
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:31:21 AM
Creation date
9/5/2019 10:53:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004963
PE
2611
FACILITY_NAME
PA-0400524
STREET_NUMBER
3782
Direction
E
STREET_NAME
GUERNSEY
STREET_TYPE
AVE
City
STOCKTON
APN
15714051
ENTERED_DATE
3/30/2005 12:00:00 AM
SITE_LOCATION
3782 E GUERNSEY AVE
RECEIVED_DATE
3/29/2005 12:00:00 AM
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\G\GUERNSEY\3782\PA-0400524\SU0004963\APPL.PDF \MIGRATIONS\G\GUERNSEY\3782\PA-0400524\SU0004963\CDD OK.PDF \MIGRATIONS\G\GUERNSEY\3782\PA-0400524\SU0004963\EH COND.PDF \MIGRATIONS\G\GUERNSEY\3782\PA-0400524\SU0004963\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L r� <br /> Chandler Martin <br /> COMMENTS ON DEVELOPMENTS <br /> PA-04-524(SU) <br /> 23. This subdivision, including streets, is subject to the County Stormwater Quality Control Criteria Plan which <br /> requires treatment,filtration, or infiltration of the 851 percentile storm and post construction Best <br /> Management Practices. <br /> 24. A San Joaquin County Stormwater Permit is required,prior to the approval of the Final Map. <br /> 25. A Stormwater Pollution Prevention Plan (SWPPP) will be submitted to Public Works prior to any site <br /> grading. <br /> 26. Post development stormwater discharge rates to Mormon Slough shall not exceed the pre-development rate. <br /> 27. A State Reclamation Board Permit shall be required for all work done within the banks of Mormon Slough. <br /> 28. Mormon Slough and a twenty-five(25)feet wide strip measured from the top of bank to the north shall be <br /> denoted as lot"A"on the subdivision map and dedicated to the San Joaquin County Flood Control and Water <br /> Conservation District. <br /> 29. A twenty (20)foot PUE and storm drain easement shall be part.of Lot B and will be dedicated to the Coutny <br /> at the time of Final Map. <br /> MRC:SH:ar <br /> P2W TA-00 M4(rtr dr iwpd <br />
The URL can be used to link to this page
Your browser does not support the video tag.