Laserfiche WebLink
May- 13. 2004 2: I1PM Neil 0• Anderson & Assoc . No- 5095 P. 13 <br /> �- 19 March 2004 <br /> AGE-NC Project No. 02-0886 <br /> Page 2 of 8 <br /> The Modesto, Riverbank and Turlock Lake Formations and overlying recent alluvium are the <br /> ., principal sources of domestic ground water in the 13,500-square mile San Joaquin Valley Ground <br /> Water Basin (Basin 5-22). This basin is drained primarily by the San Joaquin River. The closest <br /> surface water feature to the site is the Mormon Slough and Stockton Diverting Channel, located <br /> approximately 1,500 feet southand 2,000 feet eastofthe site,respectively.Water from Canals drains <br /> into the San Joaquin River Deep Water Channel and is primarily used for commercial and <br /> recreational boating. <br /> .. Based upon ground water monitoring well information obtained from Main Street and Oro Avenue <br /> (50 feet north of the site),ground water flow direction is southeast to eastemly and currently occurs <br /> at a depth of approximately 55 feet bsg within ground water wells.The sedimentary units are thought <br /> to be relatively horizontal and continuous over the area. <br /> .. 2.3. UNDERGROUND STORAGE TANK REMOVAL <br /> On 06 March 2002,three USTs,two dispenser islands and associated piping were removed from the <br /> site under AGE supervision. Six samples were collected beneath the USTs and three laboratory- <br /> composited/discrete soil samples were collected from the excavated soil. <br /> Total petroleum hydrocarbons quantified as gasoline(TPH-g)were detected at concentrations up to <br /> 86 milligram per kilo gr ( g/kg). Toluene, ethyl benzene and xylenes (TEX)were detected at <br /> concentrations of up to 13 nl g{xylene);benzene was not detected in the excavation soil samples. <br /> The highest concentrations of contaminants were present in the southern samples from tanks#2 and <br /> #3; this location was the fill area to both USTs. <br /> Approximately 200 tons of soil were excavated during removal of the USTs. Two laboratory- <br /> composite and one-discrete samples were collected from the stockpiled soil prior to placement back <br /> into the excavation after completion of UST removal;the soil was placed back into the excavation <br /> because oftheproximity to amajor roadway(adjacent).Subsequent analytical results of the discrete <br /> soil sample from one stockpile of approximately 25 yards of soil detected TPH-g at 13 mg/kg and <br /> benzene at 0.023 mg/kg.,also o,03k3 e+t1,11 0, 1/I.ryllc� +o}ai xy+� s. <br /> J 411-/ <br /> Fuel additives were not detected in the samples. Analytical results of soil sample are summarized <br /> in Tables 1 and 2.— So";�i r,$04S 4rtm,41,L 14 41G rr ni"a,✓';, arti, n&f_ IrdZ&1,a"eJrt <br /> 2.4. PREVIOUS SITE ASSESSMENT <br /> In April 2003,three soil borings(Bl,B2 and B3)were advanced and sampled at the site(Figure 2). <br /> .. Each boring was advanced to a depth of approximately 65 feet below surface grade(bsg). Soil and <br /> Adma"d Ce EnAmnm tal,Inu <br /> rr <br />