Laserfiche WebLink
UP-00-3 <br /> Page 2 of 2 <br /> D. Construction of individual sewage disposal system(s) under permit and inspection by the <br /> Environmental Health Division is required at the time of development(San Joaquin County <br /> Development Title, Section 9-1110.3 & 9-1110.4). <br /> E. Construct a water well under permit and inspection of the Environmental Health Division <br /> prior to occupancy. Should the number of non-resident individuals exceed 24 for at least 60 <br /> days per year, or the number of service connections exceed four, a yearly permit to operate a <br /> public water system will be required by the Environmental Health Division(San Joaquin <br /> County Development Title 22, Section 9-1120.2 and 9-1115.9.). <br /> The supplier must possess adequate financial, managerial, and technical capability to <br /> assure delivery of pure, wholesome, and potable drinking water in accordance with San <br /> Joaquin County Development Title, Sections 9-1120.2 and—91115.9 and C.C.R., Title <br /> 22, and Health and Safety Code, Section 116525 through 116570. <br /> F. Refuse, garbage, and other solid waste material must be stored, removed and transported to <br /> an approved landfill in accordance with San Joaquin County Ordinance Code, Section 5- <br /> 2400. <br /> G. If floor drains are required in any area other than processing areas, they must be plumbed <br /> through a sand/oil separator and discharged to an above ground system approved by the <br /> Environmental Health Division. A registered engineer must design this system. The material <br /> collected in the above ground holding system must be analyzed for hazardous constituents <br /> prior to disposal. Specific test requirements may be obtained from the Environmental Health <br /> Division. A$156.00 plan check fee is required at the time of submittal. <br /> H. If hazardous material is stored on site, applicant must register with County Office of <br /> Emergency Services. <br /> I. If hazardous waste is generated, applicant must obtain an EPA identification number and <br /> comply with applicable regulations. <br />