Laserfiche WebLink
Memorandum -2- <br /> COMMENTS ON DEVELOPMENT <br /> SA-00-59 <br /> 3. The Traffic Impact Mitigation Fee will be required for this development. The fee is due <br /> and payable at the time of building permit application. (The fee currently is $ 701 per <br /> 1,000 gross square foot of building as manufacturing generated in the Tracy area. The <br /> fee shall be automatically adjusted July 1 of each year by the Engineering Construction <br /> Cost Index as published by the Engineering News Record. A credit may be allowed if it <br /> can be verified that the existing development on this site was in operation on or after <br /> April 23, 1990. <br /> (Resolution R-00-433) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> GK:BN:gn <br /> PS-OK073-G18 <br /> E: Thomas M. Gau, Deputy Director/Development <br />