Laserfiche WebLink
SOIL SUITABILITY STUDY <br /> DOG KENNEL BUILDING <br /> TABLE OF CONTENTS <br /> 1.0 INTRODUCTION & PROPOSED DEVELOPMENT.......................................................... 3 <br /> 1.1 Site Description..................................................................................................... 3 <br /> 1.2 Proposed Development.......................................................................................... 4 <br /> 1.3 Site Vicinity .......................................................................................................... 4 <br /> 1.4 Site Map............................................................................................................... 4 <br /> 2.0 PRESENT AND PAST USES OF THE SITE.................................................................... 4 <br /> 2.1 Past and Present Site Use...................................................................................... 4 <br /> 3.0 EXISTING AND PROPOSED SEPTIC TANK USAGE....................................................... 5 <br /> 3.1 Existing On-Site Septic Tank Usage ........................................................................ 5 <br /> 3.2 Site Specific Permit History.................................................................................... 5 <br /> 3.3 Discussion of On-Site Septic Tank Repair ................................................................ 5 <br /> 3.4 Existing Septic Tank Usage in the Vicinity................................................................ 5 <br /> 3.5 Septic Permit History in the Vicinity ........................................................................ 6 <br /> 3.6 Septic Repair Permit History in the Vicinity.............................................................. 6 <br /> 3.7 Expected On-Site Maximum Septic Tank Usage ....................................................... 6 <br /> 4.0 GROUNDWATER INFORMATION............................................................................... 7 <br /> 4.1 Groundwater Depth and Gradient........................................................................... 7 <br /> 4.2 Potential Groundwater Contamination Issues........................................................... 7 <br /> 4.3 Groundwater Sample Location................................................................................ 8 <br /> 4.4 Groundwater Sample Analysis................................................................................ 8 <br /> 5.0 SOIL PROFILE AND GEOLOGIC INFORMATION.......................................................... 9 <br /> 5.1 Soil Boring Locations............................................................................................. 9 <br /> 5.2 Soil Boring Dimensions.......................................................................................... 9 <br /> 5.3 Soil Lithology Observed ......................................................................................... 9 <br /> 5.4 Discussion of Soil Lithology.................................................................................... 9 <br /> 6.0 PERCOLATION TEST INFORMATION ........................................................................10 <br /> 6.1 Percolation Test Locations ....................................................................................10 <br /> 6.2 Number of Percolation Tests.................................................................................10 <br /> 6.3 Boring Preparation and Presaturation.....................................................................10 <br /> 6.4 Condition of Borings after Presaturation.................................................................10 <br /> 6.5 Percolation Test Procedure ...................................................................................10 <br /> 6.6 Percolation Test Forms and Results .......................................................................11 <br /> 6.7 Discussion of Percolation Test Results....................................................................11 <br /> 6.8 Discussion of Septic System Sizing ........................................................................11 <br /> 7.0 CONCLUSIONS AND RECOMMENDATIONS................................................................11 <br /> 8.0 LIMITATIONS ........................................................................................................12 <br /> ©2015 Neil O.Anderson&Associates,Inc.A Terracon Company <br />