Laserfiche WebLink
SJVUAPCD <br /> Suggested Construction Site <br /> Mitigation Measures <br /> The SJVUAPCD suggests that the project applicant take all feasible measures to <br /> reduce the amount of dust (fine particulate matter-PM,o) and ozone precursors <br /> (Reactive Organic Gases (ROG), and Oxides of Nitrogen (NO2, NO,) that will result <br /> from this construction project. Specifically, the District suggests that the following <br /> Mitigation Measures be Included as part of project approval: <br /> 1 . All material excavated, graded or otherwise disturbed should be sufficiently <br /> watered to prevent excessive amounts of dust. Watering should occur at least <br /> twice dally with complete coverage, preferably in the late morning and after <br /> work is done for the day. <br /> 2. All clearing, grading, earth moving, or excavation activities should cease when <br /> wind speeds are equal to or greater than 20 mph. <br /> 3. On-site vehicle speed should be limited to 15 mph. <br /> Ozone Precursors-Ozone precursor emissions should be controlled by the following <br /> methods: <br /> 4. All Internal combustion engine driven equipment should be properly maintained <br /> and tuned according to manufacturers specifications. <br /> 5. Idling of all internal combustion equipment shall be limited to ten minutes at any <br /> given time. <br /> 6. Use of building materials that do not require the use of paints/solvents. <br />